Maintenance work for Yarmouth Bridge

This article was published in 2023 and might be out of date.
For the latest information, please visit our current works page or news page.

Yarmouth Bridge will be closed over two days next week for maintenance work including repairs to the structure’s main deck.

The bridge will be closed to traffic from 9.30am on Tuesday September 12 until 3.30pm (or sooner if possible) on Wednesday September 13. The bridge will remain open to pedestrians throughout the work and will be open at 10am and after 4.30pm for river users at the discretion of Yarmouth Harbour Commission.

The usual road diversion via Wilmingham Lane and The Middle Road will be in place during work.

“Given the location and nature of the bridge, it does require a vigorous inspection and maintenance routine in order to ensure its longevity,” said Luke Ward, project manager in Island Roads’ structures team.

“We have scheduled the work for outside of the peak summer season and while the closure is absolutely necessary, we would like to apologise in advance for any inconvenience and to thank residents for their understanding.”

Latest News

Latest on X

Please find attached an Immediate Closure for Worsley Road, Gurnard. The closure is necessary to enable Island Roads to maintain network safety repairs. @iow_council

Island Roads have closed Lushington Hill, Newport. This closure is necessary to enable Island Roads to maintain network safety.
For more information, please visit https://one.network
@iow_council

Immediate Closure for Drake Road, Newport from its junction with St Johns Road for a distance of 26 metres in a Northerly direction.

The closure is necessary to enable Southern Water to carryout urgent repairs. @iow_council