| Promoter | Ongoing works | Planned works | Completed works | Total works | Road Closures |
|---|---|---|---|---|---|
| Apply filters to see statistics. | |||||
| Road | Town | Description | Expected start | Expected end | Status | Traffic management | Responsibility | Details |
|---|---|---|---|---|---|---|---|---|
| No roadworks match the selected filters. | ||||||||
| Circular Road | Seaview |
Utility repair and maintenance works (LQ002SWAT14728175-02) |
10 November 2026 | 12 November 2026 | Completed – Finished: 11 November 2026 | Some carriageway incursion | Southern Water | View |
| Ringwood Road | Binstead |
Utility repair and maintenance works (XW150W124085206-01406-01) |
1 March 2027 | 1 April 2027 | Planned | Give and take | Southern Gas Network Plc | View |
| Arreton Street | Arreton |
Utility asset works (BC512HABOSAWH8NWG9Z-01) |
20 November 2026 | 23 November 2026 | Planned | Multi-way signals | BT | View |
| Binstead Hill | Binstead |
Utility repair and maintenance works (LQ002SWAT14730215-01) |
11 November 2026 | 16 November 2026 | In progress – Started: 11 November 2026 | Multi-way signals | Southern Water | View |
| Station Road | Wootton |
Utility repair and maintenance works (LQ003SWAT14730799-01) |
11 November 2026 | 20 November 2026 | In progress – Started: 11 November 2026 | Two-way signals | Southern Water | View |
| Seven Sisters Road | Ventnor |
Highway repair and maintenance works (LQ002SWAT14728309-01) |
9 November 2026 | 11 November 2026 | Completed – Finished: 11 November 2026 | Give and take | Southern Water | View |
| Clifford Street | Newport |
Utility repair and maintenance works (LQ002SWAT14726797-01) |
8 November 2026 | 11 November 2026 | Completed – Finished: 11 November 2026 | Some carriageway incursion | Southern Water | View |
| Holyrood Street | Newport |
Utility repair and maintenance works (LQ002SWAT14725905-01) |
9 November 2026 | 11 November 2026 | Completed – Finished: 11 November 2026 | Some carriageway incursion | Southern Water | View |
| Brookfield Gardens | Ryde |
Utility asset works (YP018WF-RY051-BG01-01) |
25 November 2026 | 27 November 2026 | Planned | No carriageway incursion | Wightfibre | View |
| Hazlemere Avenue | Binstead |
Utility asset works (YP018WF-RY052-HA01-01) |
25 November 2026 | 27 November 2026 | Planned | No carriageway incursion | Wightfibre | View |
| Mill Hill Road | Cowes |
Highway repair and maintenance works (RF101BT0103000040992-01) |
10 November 2026 | 13 November 2026 | Completed – Finished: 11 November 2026 | Two-way signals | Isle of Wight Council / Island Roads | View |
| Cycle Track From Freshwater To Yarmouth | Freshwater |
Highway repair and maintenance works (RF101BT0103000041039-01) |
14 December 2026 | 18 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Whitecross Avenue | Shanklin |
Highway repair and maintenance works (RF101BT0103000040940-02) |
10 November 2026 | 13 November 2026 | Completed – Finished: 11 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Cycle Track From Fernside Way To Kite Hill | Wootton |
Highway repair and maintenance works (RF101BT0103000041038-01) |
14 December 2026 | 18 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Cycle Track From Newport To Wootton | Newport |
Highway repair and maintenance works (RF101BT0103000041037-01) |
14 December 2026 | 18 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Swanmore Road | Ryde |
Highway repair and maintenance works (RF101BT0103000040960-01) |
2 November 2026 | 4 November 2026 | Cancelled | Some carriageway incursion | Isle of Wight Council / Island Roads | View |
| Arreton Street | Arreton |
Utility asset works (BC512HABOSA-WH6W9D1P-POL-01) |
17 February 2027 | 19 February 2027 | Planned | Road closure | BT | View |
| Newport Footpath 207 | Newport |
Highway repair and maintenance works (RF101BT0101000040945-02) |
26 October 2026 | 6 November 2026 | Completed – Finished: 6 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Nettlestone Hill | Seaview |
Highway improvement works (RF102BT0501000040839-02) |
10 November 2026 | 13 November 2026 | Completed – Finished: 11 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Priory Walk | Niton |
Utility asset works (BC312FB-CENE-V9019F-01) |
18 November 2026 | 20 November 2026 | Planned | Give and take | BT | View |
| Dennett Road | Bembridge |
Optional permit (no fee) e.g. for traffic management etc (LP703S30003272-01) |
18 November 2026 | 20 November 2026 | Planned | Temp obstruction 15 minute delay | Scottish and Southern Power Distribution (SSE) | View |
| Solent View Road | Nettlestone |
Highway repair and maintenance works (RF101BT0103000041030-02) |
30 November 2026 | 2 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Worsley Road | Newport |
Highway repair and maintenance works (RF101BT0103000041031-02) |
30 November 2026 | 2 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Littletown Lane | Havenstreet |
Highway repair and maintenance works (RF101BT0103000041032-02) |
1 December 2026 | 3 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Church Road | Wootton |
Highway repair and maintenance works (RF101BT0103000041033-02) |
1 December 2026 | 3 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Castle Street | Ryde |
Highway repair and maintenance works (RF101BT0103000041034-02) |
1 December 2026 | 3 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Mill Square | Wootton |
Highway repair and maintenance works (RF101BT0103000041035-02) |
2 December 2026 | 4 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Monkton Street | Ryde |
Highway repair and maintenance works (RF101BT0103000041036-02) |
3 December 2026 | 4 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Beechcroft Drive | Wootton |
Utility repair and maintenance works (LQ002SWAT14730719-01) |
11 November 2026 | 16 November 2026 | In progress – Started: 11 November 2026 | Some carriageway incursion | Southern Water | View |
| Clarence Road | Wroxall |
Highway repair and maintenance works (RF102BT0301000040359-02) |
9 November 2026 | 11 November 2026 | Cancelled | Road closure | Isle of Wight Council / Island Roads | View |
| Caesars Road | Newport |
Utility repair and maintenance works (LQ002SWAT14730635-01) |
11 November 2026 | 16 November 2026 | In progress – Started: 11 November 2026 | Some carriageway incursion | Southern Water | View |
| Connaught Road | East Cowes |
Utility repair and maintenance works (XW150W124117034-00430-02) |
9 November 2026 | 17 November 2026 | In progress – Started: 11 November 2026 | Road closure | Southern Gas Network Plc | View |
| Halford Close | Sandown |
Utility asset works (BC512HABL2C-WH7P5C3S-01) |
11 November 2026 | 13 November 2026 | In progress – Started: 11 November 2026 | Some carriageway incursion | BT | View |
| Clarendon Street | Newport |
Utility asset works (BC512HABOSAWH9G9F4G-01) |
5 February 2027 | 9 February 2027 | Planned | Road closure | BT | View |
| Terminus Road | Cowes |
Utility asset works (BC312FB-CENE-V8124-1-02) |
10 November 2026 | 12 November 2026 | Completed – Finished: 11 November 2026 | Give and take | BT | View |
| High Street | Ryde |
Utility asset works (BC312FB-CENE-V9124-6-01) |
17 November 2026 | 19 November 2026 | Planned | Some carriageway incursion | BT | View |
| Ranelagh Road | Lake |
Utility asset works (BC312FB-CENE-V9038-20-01) |
17 November 2026 | 19 November 2026 | Planned | Some carriageway incursion | BT | View |
| St Johns Road | Ryde |
Utility repair and maintenance works (LQ003SWAT14645030-02) |
11 November 2026 | 13 November 2026 | In progress – Started: 11 November 2026 | Multi-way signals | Southern Water | View |
| Newport Street | Ryde |
Utility asset works (BC312FB-CENE-V9087-6-01) |
17 November 2026 | 19 November 2026 | Planned | Some carriageway incursion | BT | View |
| Long Lane | Newport |
Utility repair and maintenance works (XW302W124115079-00979-01) |
8 November 2026 | 16 November 2026 | Completed – Finished: 11 November 2026 | No carriageway incursion | Southern Gas Network Plc | View |
| Bettesworth Road | Ryde |
Utility asset works (YP018WF-RY155-BR01E-04) |
18 January 2027 | 20 January 2027 | Planned | No carriageway incursion | Wightfibre | View |
| Alpine Road | Ventnor |
Highway repair and maintenance works (RF101BT0101000041005-01) |
11 November 2026 | 13 November 2026 | In progress – Started: 11 November 2026 | Two-way signals | Isle of Wight Council / Island Roads | View |
| Chatfeild Road | Niton |
Utility asset works (BC312-FB-CENE-V9019-01) |
18 November 2026 | 20 November 2026 | Planned | Give and take | BT | View |
| Broadway | Sandown |
Utility repair and maintenance works (XW302W124110623-00236-01) |
7 November 2026 | 16 November 2026 | Completed – Finished: 11 November 2026 | Multi-way signals | Southern Gas Network Plc | View |
| Town End | Niton |
Utility asset works (BC312FB-CENE-V9004G-01) |
18 November 2026 | 20 November 2026 | Planned | Give and take | BT | View |
| Broadway | Sandown |
Remedial works (LQ003SWAT14724987-02) |
10 November 2026 | 11 November 2026 | Completed – Finished: 11 November 2026 | Two-way signals | Southern Water | View |
| Lushington Hill | Newport |
Utility repair and maintenance works (LQ003SWAT14729600-01) |
10 November 2026 | 11 November 2026 | Completed – Finished: 11 November 2026 | Two-way signals | Southern Water | View |
| Town Lane | Calbourne |
Highway repair and maintenance works (RF101BT0103000040909-02) |
16 November 2026 | 20 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Ash Grove | Cowes |
Disconnection or alteration of supply (XW312W123764085-00089-01) |
10 November 2026 | 17 November 2026 | In progress – Started: 10 November 2026 | No carriageway incursion | Southern Gas Network Plc | View |
| Hogan Close | Newport |
Utility repair and maintenance works (LQ002SWAT14726792-01) |
8 November 2026 | 11 November 2026 | Completed – Finished: 11 November 2026 | Some carriageway incursion | Southern Water | View |
| Alvington Manor View | Carisbrooke |
Utility repair and maintenance works (LQ002SWAT14726810-01) |
8 November 2026 | 11 November 2026 | Completed – Finished: 11 November 2026 | Some carriageway incursion | Southern Water | View |
| Kestrel Way | Carisbrooke |
Utility repair and maintenance works (LQ002SWAT14721252-01) |
5 November 2026 | 11 November 2026 | Completed – Finished: 11 November 2026 | Some carriageway incursion | Southern Water | View |
| Victoria Street | Ventnor |
Highway repair and maintenance works (LQ002SWAT14724998-01) |
11 November 2026 | 13 November 2026 | In progress – Started: 11 November 2026 | Some carriageway incursion | Southern Water | View |
| Maxted Close | Cowes |
Utility repair and maintenance works (LQ002SWAT14728733-01) |
9 November 2026 | 11 November 2026 | Completed – Finished: 11 November 2026 | Some carriageway incursion | Southern Water | View |
| Totland Footpath 34 | Totland |
Utility repair and maintenance works (LQ003SWAT14728394-01) |
9 November 2026 | 10 November 2026 | Completed – Finished: 10 November 2026 | No carriageway incursion | Southern Water | View |
| Venner Avenue | Northwood |
Utility asset works (BC312FB-CENE-V8035-5-02) |
10 November 2026 | 12 November 2026 | Completed – Finished: 11 November 2026 | Some carriageway incursion | BT | View |
| Mill Hill Road | Cowes |
Utility repair and maintenance works (LQ002SWAT14728047-01) |
9 November 2026 | 11 November 2026 | Completed – Finished: 11 November 2026 | Some carriageway incursion | Southern Water | View |
| School Road | Godshill |
Highway improvement works (RF10231365671-02) |
2 November 2026 | 29 January 2027 | In progress – Started: 2 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Barge Lane | Wootton |
Highway repair and maintenance works (RF101BT0103000040968-02) |
16 November 2026 | 20 November 2026 | Cancelled | Road closure | Isle of Wight Council / Island Roads | View |
| Cliff Road | Cowes |
Utility repair and maintenance works (LQ002SWAT14730161-01) |
10 November 2026 | 13 November 2026 | In progress – Started: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Fairlee Road | Newport |
Highway repair and maintenance works (RF101BT0103000040991-01) |
10 November 2026 | 12 November 2026 | Completed – Finished: 10 November 2026 | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Eddington Road | Seaview |
Highway improvement works (RF102BT0501000040837-02) |
9 November 2026 | 12 November 2026 | Completed – Finished: 10 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Prospect Road | Newport |
Optional permit (no fee) e.g. for traffic management etc (LP44430432990-01) |
10 November 2026 | 21 November 2026 | In progress – Started: 10 November 2026 | Some carriageway incursion | Scottish and Southern Power Distribution (SSE) | View |
| South Street | Newport |
Utility asset works (LP44477787854-02) |
10 November 2026 | 21 November 2026 | In progress – Started: 10 November 2026 | Road closure | Scottish and Southern Power Distribution (SSE) | View |
| Elm Grove | Newport |
Utility asset works (LP44436599676-03) |
6 October 2026 | 11 November 2026 | Completed – Finished: 10 November 2026 | Road closure | Scottish and Southern Power Distribution (SSE) | View |
| Ashley Way | Brighstone |
Utility repair and maintenance works (LP333S30000801-01) |
10 November 2026 | 16 November 2026 | Completed – Finished: 11 November 2026 | Some carriageway incursion | Scottish and Southern Power Distribution (SSE) | View |
| Leeson Road | Ventnor |
Highway repair and maintenance works (RF101BT0103000040436-01) |
10 November 2026 | 12 November 2026 | In progress – Started: 10 November 2026 | Two-way signals | Isle of Wight Council / Island Roads | View |
| Osborne Road | East Cowes |
Utility asset works (YP018WF-CW115-OR01-01) |
17 November 2026 | 19 November 2026 | Planned | Some carriageway incursion | Wightfibre | View |
| Moons Hill | Totland |
Highway repair and maintenance works (RF101BT0103000040310-02) |
5 October 2026 | 9 October 2026 | Cancelled | Road closure | Isle of Wight Council / Island Roads | View |
| Castle Street | Ryde |
Highway repair and maintenance works (RF101BT0103000040879-02) |
21 October 2026 | 23 October 2026 | Cancelled | Road closure | Isle of Wight Council / Island Roads | View |
| Wellington Road | Ryde |
Utility repair and maintenance works (LQ002SWAT14666152-01) |
7 November 2026 | 10 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Old Seaview Lane | Seaview |
Utility repair and maintenance works (LP333S30000800-01) |
9 November 2026 | 13 November 2026 | Completed – Finished: 10 November 2026 | Give and take | Scottish and Southern Power Distribution (SSE) | View |
| St Pauls Crescent | Shanklin |
Highway repair and maintenance works (LQ002SWAT14725870-01) |
8 November 2026 | 11 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Esplanade | Shanklin |
Highway repair and maintenance works (LQ002SWAT14725861-01) |
8 November 2026 | 11 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| St Johns Wood Road | Ryde |
Utility repair and maintenance works (XW302W124033935-01595-01) |
10 November 2026 | 17 November 2026 | In progress – Started: 10 November 2026 | Some carriageway incursion | Southern Gas Network Plc | View |
| William Street | Ryde |
Utility repair and maintenance works (LQ002SWAT14729814-01) |
10 November 2026 | 13 November 2026 | In progress – Started: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Whitepit Lane | Newport |
Utility repair and maintenance works (LQ002SWAT14729823-01) |
10 November 2026 | 13 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Harding Shute | Brading |
Works for Rail Purposes (KL137IOW-3-12-220227-01) |
22 February 2027 | 23 February 2027 | Planned | Road closure | Network Rail | View |
| Little London | Newport |
Utility asset works (LP44450917876-03) |
11 September 2026 | 10 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Scottish and Southern Power Distribution (SSE) | View |
| Pyle Street | Newport |
Utility repair and maintenance works (LQ002SWAT14725822-01) |
5 November 2026 | 10 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Latimer Road | St Helens |
Utility repair and maintenance works (LQ002SWAT14725917-01) |
7 November 2026 | 10 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Pan Close | Newport |
Utility repair and maintenance works (LQ002SWAT14725811-01) |
5 November 2026 | 10 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Church Road | Shanklin |
Highway repair and maintenance works (RF101BT0103000040337-02) |
9 November 2026 | 11 November 2026 | Cancelled | Road closure | Isle of Wight Council / Island Roads | View |
| Appley Road | Ryde |
Utility asset works (YP018WF-RY161-AR04-01) |
16 November 2026 | 18 November 2026 | Cancelled | Two-way signals | Wightfibre | View |
| Downs View Road | St Helens |
Utility repair and maintenance works (LQ002SWAT14725928-01) |
10 November 2026 | 12 November 2026 | Planned | Some carriageway incursion | Southern Water | View |
| Castle Hill | Cowes |
Utility repair and maintenance works (LQ002SWAT14725835-01) |
12 November 2026 | 16 November 2026 | Planned | Some carriageway incursion | Southern Water | View |
| Lane End Road | Bembridge |
Utility repair and maintenance works (LQ002SWAT14725915-01) |
14 November 2026 | 17 November 2026 | Planned | Some carriageway incursion | Southern Water | View |
| Apse Manor Road | Shanklin |
Highway repair and maintenance works (LQ002SWAT14725857-01) |
14 November 2026 | 18 November 2026 | Planned | Some carriageway incursion | Southern Water | View |
| Pump Lane | Calbourne |
Highway repair and maintenance works (RF101BT0103000041028-01) |
10 November 2026 | 10 November 2026 | Completed – Finished: 10 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Binstead Hill | Binstead |
Utility repair and maintenance works (XW150W122532171-00189-02) |
16 November 2026 | 18 December 2026 | Planned | Multi-way signals | Southern Gas Network Plc | View |
| East Street | Newport |
Utility asset works (LP44497224447-02) |
23 October 2026 | 21 November 2026 | In progress – Started: 27 October 2026 | Two-way signals | Scottish and Southern Power Distribution (SSE) | View |
| Bannock Road | Whitwell |
Utility repair and maintenance works (LQ002SWAT14726708-01) |
6 November 2026 | 10 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Old Road | East Cowes |
New service connection (XW312W124002917-01224-02) |
7 December 2026 | 15 December 2026 | Planned | Two-way signals | Southern Gas Network Plc | View |
| West Street | Ryde |
Remedial works (LQ002SWAT14165928-05) |
9 November 2026 | 11 November 2026 | Completed – Finished: 10 November 2026 | Road closure | Southern Water | View |
| Marlborough Road | Ryde |
Highway improvement works (RF10237940485-02) |
18 November 2026 | 20 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| St Johns Road | Ryde |
Highway improvement works (RF10251175336-02) |
18 November 2026 | 20 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Newchurch Footpath 16 | Newchurch |
Utility repair and maintenance works (LQ007SWAT14729194-01) |
10 November 2026 | 1 December 2026 | In progress – Started: 10 November 2026 | No carriageway incursion | Southern Water | View |
| Morton Common | Brading |
Highway repair and maintenance works (RF101BT0103000040990-01) |
9 November 2026 | 11 November 2026 | Completed – Finished: 10 November 2026 | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Fairy Road | Seaview |
Highway repair and maintenance works (RF101BT0103000040939-02) |
10 November 2026 | 12 November 2026 | Completed – Finished: 10 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Kite Hill | Wootton |
Utility repair and maintenance works (LQ002SWAT14709336-03) |
24 November 2026 | 25 November 2026 | Planned | Give and take | Southern Water | View |
| Clarence Road | East Cowes |
Utility repair and maintenance works (LQ002SWAT14725844-01) |
7 November 2026 | 11 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Clarence Road | East Cowes |
Utility repair and maintenance works (LQ002SWAT14725851-01) |
7 November 2026 | 10 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Royal Exchange | Newport |
Utility repair and maintenance works (LQ002SWAT14725840-01) |
7 November 2026 | 10 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Furrlongs | Newport |
Utility repair and maintenance works (LQ002SWAT14721163-01) |
6 November 2026 | 10 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Heath Road | Lake |
Utility asset works (YP018WF-SS175-HR01-03) |
10 November 2026 | 12 November 2026 | In progress – Started: 10 November 2026 | No carriageway incursion | Wightfibre | View |
| Pelham Road | Cowes |
Utility repair and maintenance works (XW302W124093203-01280-01) |
10 November 2026 | 17 November 2026 | In progress – Started: 10 November 2026 | Road closure | Southern Gas Network Plc | View |
| Hogan Close | Newport |
Utility repair and maintenance works (LQ002SWAT14726581-01) |
6 November 2026 | 10 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Forest Road | Newchurch |
Highway repair and maintenance works (LQ002SWAT14729195-01) |
10 November 2026 | 12 November 2026 | In progress – Started: 10 November 2026 | Two-way signals | Southern Water | View |
| Westway | Northwood |
Utility repair and maintenance works (LQ002SWAT14726845-01) |
6 November 2026 | 10 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Newport Road | Cowes |
Utility repair and maintenance works (LQ002SWAT14725829-01) |
6 November 2026 | 10 November 2026 | Completed – Finished: 10 November 2026 | Some carriageway incursion | Southern Water | View |
| Whitehouse Road | Newport |
Utility repair and maintenance works (LQ002SWAT14722598-01) |
10 November 2026 | 12 November 2026 | In progress – Started: 10 November 2026 | Two-way signals | Southern Water | View |
| Church Road | Binstead |
Utility repair and maintenance works (XW302W124065478-00366-01) |
31 October 2026 | 10 November 2026 | Completed – Finished: 9 November 2026 | Give and take | Southern Gas Network Plc | View |
| Ashey Road | Ryde |
Utility asset works (BC512HABOSAWH8DRC5VPOL-01) |
8 February 2027 | 10 February 2027 | Planned | Road closure | BT | View |
| Oakfield Road | East Cowes |
Utility repair and maintenance works (XW150W123583008-01212-02) |
11 October 2026 | 11 December 2026 | In progress – Started: 16 October 2026 | Give and take | Southern Gas Network Plc | View |
| Robin Hood Street | Newport |
Utility asset works (BC512HABOSAWH7WVL5H-02) |
9 February 2027 | 11 February 2027 | Planned | Road closure | BT | View |
| Carpenters Road | Brading |
Highway repair and maintenance works (RF101BT0103000041027-01) |
16 November 2026 | 18 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Ashey View | Lake |
Utility asset works (BC512HABL2C-WH7TD93F-01) |
16 November 2026 | 18 November 2026 | Planned | Give and take | BT | View |
| Bonchurch Shute | Ventnor |
Highway repair and maintenance works (RF101BT0103000040711-02) |
2 November 2026 | 20 November 2026 | In progress – Started: 3 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| The Avenue | Totland |
Utility asset works (LQ001SWAT794562-01) |
9 November 2026 | 12 November 2026 | In progress – Started: 9 November 2026 | Multi-way signals | Southern Water | View |
| Sandown Road | Lake |
Optional permit (no fee) e.g. for traffic management etc (KL134IOW-07-50-161226-01) |
16 December 2026 | 17 December 2026 | Planned | Two-way signals | Network Rail | View |
| Combley Road | Havenstreet |
Utility asset works (BC512HABOSAWH9HH29M-02) |
9 February 2027 | 11 February 2027 | Planned | Road closure | BT | View |
| Car Park Market Street | Ventnor |
Utility asset works (BC312-FB-CEN-V23001-02) |
19 November 2026 | 23 November 2026 | Planned | Give and take | BT | View |
| Rope Walk | Seaview |
Highway repair and maintenance works (RF101BT0101000041016-02) |
2 December 2026 | 2 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Star Street | Ryde |
Utility asset works (YP018WF-RY159-SS02-02) |
16 November 2026 | 18 November 2026 | Planned | No carriageway incursion | Wightfibre | View |
| Esplanade | Ryde |
Highway repair and maintenance works (RF101BT0103000041017-02) |
2 December 2026 | 2 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Clatterford Road | Newport |
Highway repair and maintenance works (RF101BT0103000041026-01) |
18 November 2026 | 20 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| High Street | Carisbrooke |
Highway repair and maintenance works (RF101BT0103000041025-01) |
18 November 2026 | 20 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Marlborough Road | Ryde |
Highway repair and maintenance works (RF101BT0103000041021-01) |
19 November 2026 | 20 November 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Yaverland Road | Sandown |
Highway repair and maintenance works (RF101BT0103000040338-02) |
9 November 2026 | 11 November 2026 | Completed – Finished: 9 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Sandown Road | Shanklin |
Utility asset works (YP018WF-SS172-SR03-04) |
17 November 2026 | 19 November 2026 | Planned | Two-way signals | Wightfibre | View |
| Parkhurst Slip Road | Newport |
Utility repair and maintenance works (XW302W124115609-04648-01) |
9 November 2026 | 16 November 2026 | In progress – Started: 9 November 2026 | No carriageway incursion | Southern Gas Network Plc | View |
| Marsh Road | Gurnard |
Utility repair and maintenance works (YP018WF-CW008-MR01-06) |
18 November 2026 | 20 November 2026 | Planned | Some carriageway incursion | Wightfibre | View |
| Town Quay | Cowes |
Utility repair and maintenance works (LQ002SWAT14689004-04) |
27 January 2027 | 29 January 2027 | Planned | Road closure | Southern Water | View |
| Corf Road | Porchfield |
Utility repair and maintenance works (LQ002SWAT14728514-01) |
24 November 2026 | 26 November 2026 | Planned | Two-way signals | Southern Water | View |
| Yarborough Road | East Cowes |
Utility asset works (YP018WF-CW115-YR01-01) |
17 November 2026 | 19 November 2026 | Planned | No carriageway incursion | Wightfibre | View |
| Staplers Road | Newport |
Highway repair and maintenance works (RF101BT0103000041024-01) |
17 November 2026 | 19 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Salisbury Road | Ryde |
Utility repair and maintenance works (XW302W124097995-01443-01) |
9 November 2026 | 16 November 2026 | In progress – Started: 9 November 2026 | Give and take | Southern Gas Network Plc | View |
| Elenors Grove | Binstead |
Highway repair and maintenance works (RF101BT0103000041023-01) |
17 November 2026 | 19 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Winford Road | Newchurch |
Utility repair and maintenance works (XW302W124078328-01915-01) |
4 November 2026 | 18 November 2026 | In progress – Started: 4 November 2026 | Road closure | Southern Gas Network Plc | View |
| Clarence Road | East Cowes |
Highway repair and maintenance works (RF101BT0103000041022-01) |
17 November 2026 | 19 November 2026 | Planned | Some carriageway incursion | Isle of Wight Council / Island Roads | View |
| Solent View Road | Nettlestone |
Utility repair and maintenance works (LQ002SWAT14725649-01) |
13 November 2026 | 16 November 2026 | Planned | Some carriageway incursion | Southern Water | View |
| Newport Road | Cowes |
Utility repair and maintenance works (LQ002SWAT14725894-01) |
10 November 2026 | 11 November 2026 | Planned | Some carriageway incursion | Southern Water | View |
| Bridge Road | Cowes |
Utility asset works (BC512-HABOSAWH8G876W-POL-01) |
13 November 2026 | 17 November 2026 | Planned | Give and take | BT | View |
| Godshill Footpath 25 | Godshill |
Utility asset works (BC312FB-CENE-V22009-2-01) |
16 November 2026 | 18 November 2026 | Planned | Some carriageway incursion | BT | View |
| Bouldnor Road | Shalfleet |
Highway improvement works (RF102BT0501000041020-02) |
8 February 2027 | 12 March 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Oak Tree Way | East Cowes |
Utility asset works (BC512HABL2C-WH9HFD3S-01) |
15 December 2026 | 17 December 2026 | Planned | Some carriageway incursion | BT | View |
| Newport Road | Godshill |
Utility asset works (BC312FB-CENE-V22009-1-01) |
16 November 2026 | 18 November 2026 | Planned | Some carriageway incursion | BT | View |
| Victoria Avenue | Shanklin |
Utility asset works (BC512HABOSA-WH7HCR0N-POL-01) |
15 February 2027 | 17 February 2027 | Planned | Road closure | BT | View |
| Ryde Footpath 99 | Ryde |
Utility repair and maintenance works (LQ003SWAT14728146-01) |
9 November 2026 | 13 November 2026 | In progress – Started: 9 November 2026 | Road closure | Southern Water | View |
| Whitwell Road | Ventnor |
Highway repair and maintenance works (RF101BT0103000041018-02) |
14 December 2026 | 16 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Avenue Road | Freshwater |
Utility asset works (LQ001SWAT808044-01) |
4 January 2027 | 8 January 2027 | Planned | Road closure | Southern Water | View |
| Downs View Road | Newport |
Utility repair and maintenance works (LQ002SWAT14723938-01) |
3 November 2026 | 6 November 2026 | Completed – Finished: 4 November 2026 | Some carriageway incursion | Southern Water | View |
| Main Road | Shalfleet |
Utility asset works (YP018SARON-CA250-MR01-01) |
9 November 2026 | 13 November 2026 | In progress – Started: 9 November 2026 | Two-way signals | Wightfibre | View |
| Ningwood Hill | Shalfleet |
Utility asset works (YP018SARON-YA270-NH01-01) |
9 November 2026 | 13 November 2026 | In progress – Started: 9 November 2026 | Two-way signals | Wightfibre | View |
| Jubilee Close | Freshwater |
Utility repair and maintenance works (XW302W124070675-00901-01) |
2 November 2026 | 20 November 2026 | In progress – Started: 2 November 2026 | Give and take | Southern Gas Network Plc | View |
| Park Close | Newport |
Utility asset works (BC512HABL2C-WH7PDL2D-01) |
5 November 2026 | 10 November 2026 | Completed – Finished: 9 November 2026 | Some carriageway incursion | BT | View |
| Queens Road | Freshwater |
Remedial works (YP018FW261-LANES-QUR01-05) |
9 November 2026 | 13 November 2026 | In progress – Started: 9 November 2026 | Road closure | Wightfibre | View |
| Rew Street | Gurnard |
Utility asset works (YP018WF-CW009-RS01-02) |
9 November 2026 | 13 November 2026 | In progress – Started: 9 November 2026 | Road closure | Wightfibre | View |
| Great Preston Road | Ryde |
Remedial works (YP018VS-RY156_160-01-03) |
9 November 2026 | 9 November 2026 | Completed – Finished: 9 November 2026 | No carriageway incursion | Wightfibre | View |
| Elm Lane | Calbourne |
Utility repair and maintenance works (LQ002SWAT14666215-02) |
9 November 2026 | 11 November 2026 | In progress – Started: 9 November 2026 | Road closure | Southern Water | View |
| Appuldurcombe Road | Wroxall |
Utility repair and maintenance works (LP703S30003265-01) |
19 January 2027 | 21 January 2027 | Planned | Road closure | Scottish and Southern Power Distribution (SSE) | View |
| Shore Road | Ventnor |
Highway repair and maintenance works (RF10149955821-01) |
6 November 2026 | 3 December 2026 | Completed – Finished: 6 November 2026 | Give and take | Isle of Wight Council / Island Roads | View |
| Medina Way | Newport |
Highway repair and maintenance works (RF101BT0101000040928-02) |
4 November 2026 | 6 November 2026 | Completed – Finished: 6 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| High Street | Godshill |
Highway repair and maintenance works (RF102BT0501000034598-02) |
2 November 2026 | 2 February 2027 | In progress – Started: 4 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| York Avenue | East Cowes |
Utility repair and maintenance works (LQ003SWAT14699011-01) |
2 October 2026 | 6 November 2026 | Completed – Finished: 6 November 2026 | Road closure | Southern Water | View |
| Well Road | East Cowes |
Utility repair and maintenance works (LQ002SWAT14726822-01) |
12 November 2026 | 16 November 2026 | Planned | Some carriageway incursion | Southern Water | View |
| St Johns Wood Road | Ryde |
Utility repair and maintenance works (LQ002SWAT14726785-01) |
6 November 2026 | 10 November 2026 | Completed – Finished: 6 November 2026 | Some carriageway incursion | Southern Water | View |
| Whitwell Road | Ventnor |
Highway repair and maintenance works (RF101BT0103000040653-02) |
12 October 2026 | 14 October 2026 | Cancelled | Road closure | Isle of Wight Council / Island Roads | View |
| Station Approach | Lake |
Utility repair and maintenance works (BC00806NOVSD8VAF81-01) |
6 November 2026 | 6 November 2026 | Completed – Finished: 6 November 2026 | Two-way signals | BT | View |
| Garden Way | Newport |
Utility repair and maintenance works (LQ002SWAT14725801-01) |
5 November 2026 | 9 November 2026 | Completed – Finished: 6 November 2026 | Some carriageway incursion | Southern Water | View |
| Whitecross Avenue | Shanklin |
Highway repair and maintenance works (LQ002SWAT14724874-01) |
5 November 2026 | 9 November 2026 | Completed – Finished: 6 November 2026 | Some carriageway incursion | Southern Water | View |
| Chapel Street | Newport |
Utility repair and maintenance works (XW150W123334234-00327-02) |
11 October 2026 | 13 November 2026 | In progress – Started: 12 October 2026 | Road closure | Southern Gas Network Plc | View |
| Osborne Road | East Cowes |
Utility repair and maintenance works (LQ002SWAT14724384-03) |
7 December 2026 | 10 December 2026 | Planned | Road closure | Southern Water | View |
| Kings Bay Path | Ventnor |
Highway repair and maintenance works (RF10110597249-01) |
29 September 2025 | 6 May 2027 | In progress – Started: 29 September 2025 | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Sylvan Drive | Newport |
Utility repair and maintenance works (LQ002SWAT14721347-01) |
5 November 2026 | 9 November 2026 | Completed – Finished: 6 November 2026 | Some carriageway incursion | Southern Water | View |
| Kinchington Road | Carisbrooke |
Utility repair and maintenance works (LQ002SWAT14709965-01) |
6 November 2026 | 10 November 2026 | Completed – Finished: 6 November 2026 | Some carriageway incursion | Southern Water | View |
| Mountbatten Drive | Newport |
Utility repair and maintenance works (LQ002SWAT14725877-01) |
5 November 2026 | 10 November 2026 | Completed – Finished: 6 November 2026 | Some carriageway incursion | Southern Water | View |
| Elm Grove | Cowes |
Remedial works (YP018WF-CW001-EG01-02) |
6 November 2026 | 10 November 2026 | Completed – Finished: 6 November 2026 | Some carriageway incursion | Wightfibre | View |
| Albert Street | Ventnor |
Utility repair and maintenance works (LQ002SWAT14720349-01) |
4 November 2026 | 6 November 2026 | Completed – Finished: 6 November 2026 | Some carriageway incursion | Southern Water | View |
| Clarence Road | Newport |
Utility repair and maintenance works (LQ002SWAT14723785-01) |
4 November 2026 | 6 November 2026 | Completed – Finished: 6 November 2026 | Some carriageway incursion | Southern Water | View |
| Madeira Road | Ventnor |
Utility repair and maintenance works (LQ002SWAT14725658-01) |
5 November 2026 | 9 November 2026 | Completed – Finished: 6 November 2026 | Some carriageway incursion | Southern Water | View |
| Hildyards Crescent | Lake |
Highway repair and maintenance works (LQ002SWAT14724878-01) |
5 November 2026 | 9 November 2026 | Completed – Finished: 6 November 2026 | Some carriageway incursion | Southern Water | View |
| St Thomas Square | Ryde |
Utility repair and maintenance works (LP333S30000799-01) |
4 November 2026 | 17 November 2026 | In progress – Started: 4 November 2026 | Road closure | Scottish and Southern Power Distribution (SSE) | View |
| Lessland Lane | Godshill |
Utility asset works (BC512HABOSAWGTP846W-02) |
9 February 2027 | 11 February 2027 | Planned | Road closure | BT | View |
| Eden Road | Totland |
Highway repair and maintenance works (RF101BT0103000040911-02) |
4 November 2026 | 10 November 2026 | Completed – Finished: 6 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Kingston Road | East Cowes |
Remedial works (YP018WF-CW115-KR01-02) |
6 November 2026 | 6 November 2026 | Completed – Finished: 6 November 2026 | Some carriageway incursion | Wightfibre | View |
| St Johns Road | Sandown |
Highway repair and maintenance works (RF101BT0103000040910-02) |
4 November 2026 | 10 November 2026 | Completed – Finished: 6 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| New Road | Porchfield |
Utility repair and maintenance works (LQ002SWAT14719072-01) |
5 November 2026 | 9 November 2026 | Completed – Finished: 6 November 2026 | Give and take | Southern Water | View |
| Ocean View Road | Ventnor |
Utility repair and maintenance works (LQ002SWAT14574181-04) |
5 January 2027 | 8 January 2027 | Planned | Road closure | Southern Water | View |
| Hungerberry Close | Shanklin |
Utility asset works (BC412HABL2C-WH6TFD3F-01) |
4 November 2026 | 9 November 2026 | Completed – Finished: 6 November 2026 | Some carriageway incursion | BT | View |
| Seven Sisters Road | Ventnor |
Highway repair and maintenance works (LQ002SWAT14719343-01) |
5 November 2026 | 9 November 2026 | Completed – Finished: 6 November 2026 | Give and take | Southern Water | View |
| Yarborough Close | Godshill |
Utility asset works (BC312FB-CENE-V9002-20-01) |
16 November 2026 | 18 November 2026 | Planned | Some carriageway incursion | BT | View |
| George Street | Sandown |
Remedial works (YP018WF-SS173-GS01-04) |
6 November 2026 | 10 November 2026 | Completed – Finished: 6 November 2026 | Some carriageway incursion | Wightfibre | View |
| Forest Dell | Newchurch |
Highway repair and maintenance works (LQ002SWAT14718819-01) |
4 November 2026 | 6 November 2026 | Completed – Finished: 6 November 2026 | Some carriageway incursion | Southern Water | View |
| Shide Road | Newport |
Utility repair and maintenance works (LQ003SWAT14726033-01) |
5 November 2026 | 6 November 2026 | Completed – Finished: 6 November 2026 | Road closure | Southern Water | View |
| Maple Drive | Newport |
Utility asset works (BC512HABL2C-WH9GF36J-01) |
15 December 2026 | 17 December 2026 | Planned | Give and take | BT | View |
| Upton Road | Ryde |
Highway repair and maintenance works (LQ002SWAT14655104-04) |
14 December 2026 | 17 December 2026 | Planned | Road closure | Southern Water | View |
| Grove Road | Ventnor |
Utility repair and maintenance works (LQ002SWAT14723459-01) |
3 November 2026 | 5 November 2026 | Completed – Finished: 5 November 2026 | Road closure | Southern Water | View |
| Seaview Lane | Nettlestone |
Utility repair and maintenance works (LQ002SWAT14724492-01) |
4 November 2026 | 6 November 2026 | Completed – Finished: 5 November 2026 | Road closure | Southern Water | View |
| Colwell Road | Freshwater |
Remedial works (YP018FW264-LANES-CWR02-10) |
5 November 2026 | 6 November 2026 | Completed – Finished: 5 November 2026 | Two-way signals | Wightfibre | View |
| Shore Road | Ventnor |
Highway improvement works (RF10299921278-02) |
5 November 2026 | 6 November 2026 | Completed – Finished: 6 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Terminus Road | Cowes |
Highway repair and maintenance works (RF10142551766-01) |
2 November 2026 | 3 November 2026 | Completed – Finished: 3 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Grove Close | Newport |
Highway improvement works (RF102BT0501000040933-01) |
2 November 2026 | 13 November 2026 | Completed – Finished: 5 November 2026 | Some carriageway incursion | Isle of Wight Council / Island Roads | View |
| Bridgeway | Wootton |
Highway improvement works (RF10227926241-01) |
30 October 2026 | 6 November 2026 | Completed – Finished: 5 November 2026 | Some carriageway incursion | Isle of Wight Council / Island Roads | View |
| Afton Road | Freshwater |
Utility asset works (LQ001SWAT773837-02) |
13 October 2026 | 6 November 2026 | Completed – Finished: 5 November 2026 | Multi-way signals | Southern Water | View |
| Newport Road | Godshill |
Highway repair and maintenance works (RF101BT0101000040955-01) |
3 November 2026 | 5 November 2026 | Completed – Finished: 5 November 2026 | Two-way signals | Isle of Wight Council / Island Roads | View |
| Lincoln Way | Bembridge |
Utility asset works (YP018WF-BE170-LW02-02) |
5 November 2026 | 9 November 2026 | Completed – Finished: 5 November 2026 | No carriageway incursion | Wightfibre | View |
| Bonchurch Village Road | Ventnor |
Highway improvement works (RF10257650252-02) |
5 November 2026 | 6 November 2026 | Completed – Finished: 5 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Oaklyn Gardens | Shanklin |
Highway repair and maintenance works (LQ002SWAT14725950-01) |
5 November 2026 | 10 November 2026 | Completed – Finished: 5 November 2026 | Some carriageway incursion | Southern Water | View |
| Station Road | Shalfleet |
Optional permit (no fee) e.g. for traffic management etc (LP300S30000292-01) |
4 November 2026 | 5 November 2026 | Completed – Finished: 5 November 2026 | Temp obstruction 15 minute delay | Scottish and Southern Power Distribution (SSE) | View |
| Worsley Road | Godshill |
Utility asset works (BC312FB-CENE-V9015-12-01) |
16 November 2026 | 18 November 2026 | Planned | Some carriageway incursion | BT | View |
| Newport Road | Godshill |
Utility asset works (BC312FB-CENE-V9015-13-1-01) |
16 November 2026 | 18 November 2026 | Planned | Some carriageway incursion | BT | View |
| Mayfield Road | East Cowes |
Utility repair and maintenance works (XW150W123309040-01062-02) |
7 September 2026 | 6 November 2026 | Completed – Finished: 5 November 2026 | Road closure | Southern Gas Network Plc | View |
| Ash Road | Newport |
Utility repair and maintenance works (LQ002SWAT14722242-01) |
2 November 2026 | 5 November 2026 | Completed – Finished: 5 November 2026 | Some carriageway incursion | Southern Water | View |
| High Street | Godshill |
Utility repair and maintenance works (LQ003SWAT14725509-01) |
5 November 2026 | 5 November 2026 | Completed – Finished: 5 November 2026 | Some carriageway incursion | Southern Water | View |
| Madeira Road | Ventnor |
Highway repair and maintenance works (LQ002SWAT14725790-02) |
15 December 2026 | 17 December 2026 | Planned | Road closure | Southern Water | View |
| Solent Hill | Freshwater |
Utility asset works (BC512HABOSA-FBD88291-POL-01) |
18 January 2027 | 20 January 2027 | Planned | Some carriageway incursion | BT | View |
| Niton And Whitwell Footpath 43 | Niton |
Utility repair and maintenance works (LP333S30000797-01) |
30 October 2026 | 5 November 2026 | Completed – Finished: 5 November 2026 | No carriageway incursion | Scottish and Southern Power Distribution (SSE) | View |
| The Avenue | Totland |
Highway repair and maintenance works (RF101BT0103000040385-01) |
26 October 2026 | 28 October 2026 | Completed – Finished: 5 November 2026 | Two-way signals | Isle of Wight Council / Island Roads | View |
| Fleet Way | Shalfleet |
Highway repair and maintenance works (RF101BT0103000040962-01) |
4 November 2026 | 9 November 2026 | Completed – Finished: 5 November 2026 | Some carriageway incursion | Isle of Wight Council / Island Roads | View |
| Laundry Lane | Newport |
Utility repair and maintenance works (LQ002SWAT14725677-02) |
14 December 2026 | 16 December 2026 | Planned | Road closure | Southern Water | View |
| Sutton Close | Ryde |
Utility repair and maintenance works (YP018WF-RY160-SC01-01) |
5 November 2026 | 9 November 2026 | Completed – Finished: 5 November 2026 | No carriageway incursion | Wightfibre | View |
| Town End | Niton |
Utility asset works (BC312FB-CENE-V9004F-01) |
12 November 2026 | 16 November 2026 | Cancelled | Temp obstruction 15 minute delay | BT | View |
| Cycle Track From Sandown To Newport | Sandown |
Highway repair and maintenance works (RF101BT0103000041008-02) |
30 November 2026 | 11 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Cycle Track From Sandown To Newport | Sandown |
Highway repair and maintenance works (RF101BT0103000041009-02) |
30 November 2026 | 11 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Cycle Track From Sandown To Newport | Sandown |
Highway repair and maintenance works (RF101BT0103000041013-02) |
30 November 2026 | 11 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Cycle Track From Sandown To Newport | Sandown |
Highway repair and maintenance works (RF101BT0103000041014-02) |
30 November 2026 | 11 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Cycle Track From Shanklin To Wroxall | Shanklin |
Highway repair and maintenance works (RF101BT0103000041015-02) |
30 November 2026 | 11 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Cycle Track From Sandown To Newport | Sandown |
Highway repair and maintenance works (RF101BT0103000041012-02) |
30 November 2026 | 11 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Blythe Shute | Chale |
Highway repair and maintenance works (RF101BT0103000040754-02) |
2 November 2026 | 6 November 2026 | Completed – Finished: 5 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Cycle Track From Sandown To Newport | Sandown |
Highway repair and maintenance works (RF101BT0103000041010-02) |
30 November 2026 | 11 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| St Johns Road | Ryde |
Highway repair and maintenance works (RF101BT0103000040401-01) |
3 November 2026 | 5 November 2026 | Completed – Finished: 5 November 2026 | Two-way signals | Isle of Wight Council / Island Roads | View |
| Prospect Road | Cowes |
Highway repair and maintenance works (RF101BT0103000040931-02) |
4 November 2026 | 9 November 2026 | In progress – Started: 5 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Baring Road | Cowes |
Highway repair and maintenance works (RF101BT0103000040947-01) |
4 November 2026 | 9 November 2026 | Completed – Finished: 5 November 2026 | Some carriageway incursion | Isle of Wight Council / Island Roads | View |
| Fir Tree Close | Shanklin |
Highway repair and maintenance works (LQ002SWAT14721263-01) |
2 November 2026 | 5 November 2026 | Completed – Finished: 5 November 2026 | Some carriageway incursion | Southern Water | View |
| High Street | Yarmouth |
Utility repair and maintenance works (LQ002SWAT14690295-02) |
2 November 2026 | 4 November 2026 | Completed – Finished: 5 November 2026 | Road closure | Southern Water | View |
| Newport Road | Lake |
Utility asset works (BC312FB-CENE-22063-01) |
3 December 2026 | 7 December 2026 | Planned | Multi-way signals | BT | View |
| Wilton Park Road | Shanklin |
Utility asset works (BC512HABOSA-WH7JT20N-POL-01) |
13 November 2026 | 17 November 2026 | Planned | Give and take | BT | View |
| Queens Road | Shanklin |
Highway repair and maintenance works (LQ002SWAT14720310-01) |
5 November 2026 | 9 November 2026 | Completed – Finished: 5 November 2026 | Some carriageway incursion | Southern Water | View |
| Arctic Road | Cowes |
Utility repair and maintenance works (LQ002SWAT14721554-01) |
31 October 2026 | 5 November 2026 | Completed – Finished: 5 November 2026 | Some carriageway incursion | Southern Water | View |
| Brading Down Road | Brading |
Highway repair and maintenance works (LQ002SWAT14724244-02) |
16 November 2026 | 4 December 2026 | Planned | Two-way signals | Southern Water | View |
| Lamorbey Road | Lake |
Utility repair and maintenance works (LQ003SWAT14725015-01) |
4 November 2026 | 5 November 2026 | Completed – Finished: 5 November 2026 | Road closure | Southern Water | View |
| Solent Gardens | Freshwater |
Utility repair and maintenance works (LQ002SWAT14725285-01) |
13 November 2026 | 17 November 2026 | Planned | Some carriageway incursion | Southern Water | View |
| Merstone Lane | Godshill |
Remedial works (YP018AP225-AR-LANES-MERS-03) |
1 February 2027 | 12 February 2027 | Planned | No carriageway incursion | Wightfibre | View |
| Cherry Side | Lake |
Utility asset works (BC412HABL2C-WH6M0C0N-01) |
4 November 2026 | 6 November 2026 | Completed – Finished: 5 November 2026 | Some carriageway incursion | BT | View |
| Church Litten | Newport |
Optional permit (no fee) e.g. for traffic management etc (LP44423431332-01) |
4 November 2026 | 21 November 2026 | In progress – Started: 4 November 2026 | Road closure | Scottish and Southern Power Distribution (SSE) | View |
| Furrlongs | Newport |
Optional permit (no fee) e.g. for traffic management etc (LP44422431082-01) |
4 November 2026 | 21 November 2026 | In progress – Started: 4 November 2026 | Some carriageway incursion | Scottish and Southern Power Distribution (SSE) | View |
| Medina Way | Newport |
Highway repair and maintenance works (RF101BT0101000040927-02) |
2 November 2026 | 4 November 2026 | Completed – Finished: 4 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Dover Street | Ryde |
Remedial works (YP018RY158-9-MMB-03-11) |
2 November 2026 | 6 November 2026 | Completed – Finished: 4 November 2026 | Two-way signals | Wightfibre | View |
| Marlborough Road | Ryde |
Highway improvement works (RF10211716967-02) |
2 November 2026 | 11 November 2026 | Completed – Finished: 4 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| St Johns Road | Ryde |
Highway improvement works (RF10226492030-02) |
4 November 2026 | 5 November 2026 | Completed – Finished: 4 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Esplanade | Sandown |
Highway repair and maintenance works (RF101BT0103000040948-01) |
11 November 2026 | 13 November 2026 | Completed – Finished: 4 November 2026 | Some carriageway incursion | Isle of Wight Council / Island Roads | View |
| Main Road | Chillerton |
Utility repair and maintenance works (LQ006SWAT14627170-03) |
4 November 2026 | 4 November 2026 | Completed – Finished: 4 November 2026 | Two-way signals | Southern Water | View |
| Caesars Road | Newport |
Utility repair and maintenance works (XW302W124069141-00274-01) |
31 October 2026 | 9 November 2026 | Completed – Finished: 4 November 2026 | No carriageway incursion | Southern Gas Network Plc | View |
| Main Road | Newbridge |
Utility repair and maintenance works (LQ002SWAT14722333-01) |
2 November 2026 | 4 November 2026 | Completed – Finished: 4 November 2026 | Two-way signals | Southern Water | View |
| Pallance Road | Northwood |
Utility repair and maintenance works (LQ002SWAT14709317-01) |
2 November 2026 | 4 November 2026 | Completed – Finished: 4 November 2026 | Two-way signals | Southern Water | View |
| Bellevue Road | Ventnor |
Utility asset works (BC312FB-CENE-V22096-1-01) |
14 November 2026 | 15 November 2026 | Planned | Some carriageway incursion | BT | View |
| Madeira Road | Ventnor |
Utility asset works (BC312FB-CENE-V23013-1-01) |
14 November 2026 | 15 November 2026 | Planned | Some carriageway incursion | BT | View |
| Wellington Road | Newport |
Utility asset works (YP018WF-RY053-WR01-02) |
4 November 2026 | 6 November 2026 | Completed – Finished: 4 November 2026 | Some carriageway incursion | Wightfibre | View |
| High Street | Wootton |
Utility repair and maintenance works (LQ002SWAT14581456-01) |
18 November 2026 | 19 November 2026 | Planned | Multi-way signals | Southern Water | View |
| Ventnor Footpath 114h | Ventnor |
Highway repair and maintenance works (RF101BT0101000041006-02) |
23 November 2026 | 23 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| St Edmunds Walk | Wootton |
Utility asset works (BC312FB-CENE-V9011-15-01) |
11 November 2026 | 13 November 2026 | Planned | Some carriageway incursion | BT | View |
| Esplanade Road | Ventnor |
Highway repair and maintenance works (RF101BT0101000041007-02) |
30 November 2026 | 2 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Warlands Lane | Shalfleet |
Utility repair and maintenance works (LP300S30000305-01) |
4 November 2026 | 4 November 2026 | Completed – Finished: 4 November 2026 | Temp obstruction 15 minute delay | Scottish and Southern Power Distribution (SSE) | View |
| Medina View | East Cowes |
Utility repair and maintenance works (LQ002SWAT14720296-01) |
31 October 2026 | 4 November 2026 | Completed – Finished: 4 November 2026 | Some carriageway incursion | Southern Water | View |
| Perowne Way | Sandown |
Utility asset works (BC512HABL2C-WH7M9F2R-01) |
3 November 2026 | 5 November 2026 | Completed – Finished: 4 November 2026 | Some carriageway incursion | BT | View |
| St Boniface Road | Ventnor |
Utility repair and maintenance works (LQ002SWAT14723298-01) |
3 November 2026 | 5 November 2026 | Completed – Finished: 4 November 2026 | Road closure | Southern Water | View |
| St Johns Road | Wroxall |
Highway repair and maintenance works (LQ002SWAT14722157-01) |
2 November 2026 | 4 November 2026 | Completed – Finished: 4 November 2026 | Road closure | Southern Water | View |
| Esplanade | Ryde |
Highway repair and maintenance works (RF101BT0103000040982-01) |
17 November 2026 | 17 November 2026 | Cancelled | Lane closure | Isle of Wight Council / Island Roads | View |
| Forest Road | Newport |
Highway repair and maintenance works (RF101BT0103000040738-01) |
2 November 2026 | 4 November 2026 | Completed – Finished: 4 November 2026 | Two-way signals | Isle of Wight Council / Island Roads | View |
| Marlborough Close | Ryde |
Highway improvement works (RF10209726716-02) |
2 November 2026 | 11 November 2026 | Cancelled | Road closure | Isle of Wight Council / Island Roads | View |
| Marlborough Road | Ryde |
Highway improvement works (RF102BT0501000039685-02) |
2 November 2026 | 11 November 2026 | Cancelled | Road closure | Isle of Wight Council / Island Roads | View |
| Main Road | Chillerton |
Highway repair and maintenance works (LQ002SWAT14721278-01) |
30 October 2026 | 4 November 2026 | Completed – Finished: 4 November 2026 | Some carriageway incursion | Southern Water | View |
| Park Avenue | Ventnor |
Highway repair and maintenance works (LQ002SWAT14723474-01) |
3 November 2026 | 5 November 2026 | Completed – Finished: 4 November 2026 | Multi-way signals | Southern Water | View |
| Solent View Road | Gurnard |
Utility repair and maintenance works (LQ002SWAT14721248-01) |
31 October 2026 | 4 November 2026 | Completed – Finished: 4 November 2026 | Some carriageway incursion | Southern Water | View |
| Undercliff Drive | Ventnor |
Highway repair and maintenance works (RF101BT0103000040335-02) |
2 November 2026 | 6 November 2026 | Cancelled | Road closure | Isle of Wight Council / Island Roads | View |
| Old Park Road | Ventnor |
Highway repair and maintenance works (LQ002SWAT14672263-02) |
3 November 2026 | 5 November 2026 | Completed – Finished: 4 November 2026 | Road closure | Southern Water | View |
| Purdy Road | Carisbrooke |
Highway repair and maintenance works (RF101BT0103000040930-02) |
3 November 2026 | 6 November 2026 | Completed – Finished: 4 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Arnold Road | Binstead |
Utility repair and maintenance works (LQ002SWAT14722976-02) |
8 December 2026 | 10 December 2026 | Planned | Road closure | Southern Water | View |
| Mill Hill Road | Cowes |
Utility repair and maintenance works (LQ002SWAT14722675-02) |
7 December 2026 | 9 December 2026 | Planned | Road closure | Southern Water | View |
| High Street | Carisbrooke |
Utility repair and maintenance works (LQ003SWAT14723950-01) |
3 November 2026 | 4 November 2026 | Completed – Finished: 4 November 2026 | Road closure | Southern Water | View |
| Nicholson Road | Ryde |
Utility asset works (YP018WF-RY160-NR01-01) |
3 November 2026 | 5 November 2026 | Completed – Finished: 3 November 2026 | Some carriageway incursion | Wightfibre | View |
| Bullen Road | Nettlestone |
Highway repair and maintenance works (RF101BT0103000040755-02) |
12 October 2026 | 16 October 2026 | Completed – Finished: 3 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Bridge Road | Yarmouth |
Highway repair and maintenance works (RF101BT0103000040894-02) |
2 November 2026 | 4 November 2026 | Completed – Finished: 3 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Betty Haunt Lane | Newport |
Highway repair and maintenance works (RF101BT0103000041003-02) |
24 November 2026 | 26 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Cross Street | Ryde |
Highway repair and maintenance works (LQ002SWAT14719007-01) |
6 November 2026 | 9 November 2026 | Planned | Some carriageway incursion | Southern Water | View |
| Trafalgar Road | Newport |
Utility asset works (LP44481509615-03) |
23 November 2026 | 9 December 2026 | Planned | Multi-way signals | Scottish and Southern Power Distribution (SSE) | View |
| Cycle Track From Newport To Cowes | Newport |
Highway repair and maintenance works (RF101BT0103000040995-02) |
23 November 2026 | 27 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Cycle Track From Newport To Cowes | Newport |
Highway repair and maintenance works (RF101BT0103000040996-02) |
23 November 2026 | 27 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Standen Avenue | Newport |
Highway repair and maintenance works (RF101BT0103000040997-02) |
23 November 2026 | 25 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Summers Lane | Totland |
Highway repair and maintenance works (RF101BT0103000040998-02) |
23 November 2026 | 25 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Sylvan Drive | Newport |
Highway repair and maintenance works (RF101BT0103000041004-02) |
24 November 2026 | 26 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| The Avenue | Gurnard |
Highway repair and maintenance works (RF101BT0103000040999-02) |
24 November 2026 | 26 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Medeway | Lake |
Highway repair and maintenance works (RF101BT0103000041001-02) |
25 November 2026 | 27 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| West Hill Road | Ryde |
Highway repair and maintenance works (RF101BT0103000041002-02) |
25 November 2026 | 27 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Lake Green Road | Lake |
Highway repair and maintenance works (RF101BT0103000041000-02) |
25 November 2026 | 27 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Station Road | Shalfleet |
Highway repair and maintenance works (RF101BT0103000040994-01) |
11 November 2026 | 13 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Arreton Street | Arreton |
Utility asset works (YP018WF-AP225-AS02-02) |
11 November 2026 | 13 November 2026 | Planned | Two-way signals | Wightfibre | View |
| Well Road | East Cowes |
Highway repair and maintenance works (RF101BT0103000040804-02) |
2 November 2026 | 6 November 2026 | In progress – Started: 3 November 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| West Street | Ryde |
Highway repair and maintenance works (RF101BT0103000040336-02) |
2 November 2026 | 4 November 2026 | In progress – Started: 15 May 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Somerset Road | Seaview |
Utility repair and maintenance works (XW150W122519311-01532-02) |
2 November 2026 | 12 November 2026 | In progress – Started: 2 November 2026 | Road closure | Southern Gas Network Plc | View |
| Home Farm Path | Lake |
Utility asset works (BC512HABL2CWH8T168L-01) |
14 December 2026 | 16 December 2026 | Planned | Some carriageway incursion | BT | View |
| Forest Road | Newchurch |
Utility asset works (BC512HABOSAWH8RFK8L-FC-01) |
8 December 2026 | 10 December 2026 | Planned | Give and take | BT | View |
| Hayward Avenue | Ryde |
Utility asset works (BC512HABL2CWH8P618L-01) |
9 December 2026 | 11 December 2026 | Planned | Some carriageway incursion | BT | View |
| Furrlongs | Newport |
Utility asset works (BC512HABL2CWH8R9W4T-01) |
11 December 2026 | 15 December 2026 | Planned | Some carriageway incursion | BT | View |
| Newport Road | Lake |
Highway improvement works (RF102BT0501000040549-02) |
18 April 2027 | 7 May 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Broadway Roundabout | Totland |
Highway improvement works (RF102BT0501000040802-02) |
11 January 2027 | 22 January 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Church Hill | Totland |
Highway improvement works (RF10251821275-02) |
11 January 2027 | 22 January 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Forest Road | Newport |
Highway improvement works (RF10267804154-02) |
25 January 2027 | 5 February 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Forest Road | Newport |
Highway improvement works (RF10267267565-01) |
1 February 2027 | 12 February 2027 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Fairy Road | Seaview |
Highway improvement works (RF102BT0501000038288-02) |
8 February 2027 | 26 February 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| South Street | Yarmouth |
Highway improvement works (RF102BT0501000039362-02) |
1 March 2027 | 12 March 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Station Road | Yarmouth |
Highway improvement works (RF102BT0501000039366-02) |
8 March 2027 | 19 March 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Victoria Road | Yarmouth |
Highway improvement works (RF102BT0501000039367-02) |
8 March 2027 | 19 March 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Bonchurch Shute | Ventnor |
Highway improvement works (RF102BT0501000039365-02) |
15 March 2027 | 25 March 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| High Street | Shanklin |
Highway repair and maintenance works (RF101BT0101000040986-01) |
24 November 2026 | 24 November 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Tuttons Hill | Gurnard |
Highway repair and maintenance works (RF101BT0101000040987-01) |
24 November 2026 | 24 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Leeson Road | Ventnor |
Highway repair and maintenance works (RF101BT0103000040984-01) |
17 November 2026 | 18 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Chine Avenue | Shanklin |
Highway repair and maintenance works (LQ002SWAT14709303-02) |
7 December 2026 | 9 December 2026 | Planned | Road closure | Southern Water | View |
| Medina Avenue | Newport |
Highway repair and maintenance works (RF101BT0103000040981-01) |
10 November 2026 | 12 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| High Street | Sandown |
Disconnection or alteration of supply (XW312W123558303-00815-2-03) |
16 November 2026 | 23 November 2026 | Planned | Road closure | Southern Gas Network Plc | View |
| Long Lane | Newport |
Utility repair and maintenance works (LQ002SWAT14694844-02) |
12 November 2026 | 13 November 2026 | Planned | Two-way signals | Southern Water | View |
| Combley Road | Havenstreet |
Highway repair and maintenance works (RF101BT0103000040979-02) |
14 December 2026 | 16 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Church Road | Wootton |
Utility repair and maintenance works (LQ002SWAT14716940-01) |
14 December 2026 | 16 December 2026 | Planned | Road closure | Southern Water | View |
| Godshill Park Road | Godshill |
Highway repair and maintenance works (RF101BT0103000040977-02) |
18 November 2026 | 20 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Fitzroy Street | Sandown |
Highway repair and maintenance works (RF101BT0103000040978-02) |
18 November 2026 | 20 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Kingston Road | Shorwell |
Highway repair and maintenance works (RF101BT0103000040975-02) |
18 November 2026 | 20 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Burnt House Lane | Newport |
Highway repair and maintenance works (RF101BT0103000040973-02) |
17 November 2026 | 19 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Brook Road | Shanklin |
Highway repair and maintenance works (RF101BT0103000040974-02) |
17 November 2026 | 19 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Newport Road | Niton |
Highway repair and maintenance works (RF101BT0101000040972-02) |
17 November 2026 | 19 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Marshcombe Shute | Brading |
Highway repair and maintenance works (RF101BT0101000040971-02) |
16 November 2026 | 18 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Pump Lane | Calbourne |
Highway repair and maintenance works (RF101BT0103000040970-02) |
16 November 2026 | 18 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Calbourne Road | Newport |
Highway repair and maintenance works (RF101BT0103000040969-02) |
16 November 2026 | 16 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Well Road | East Cowes |
Highway repair and maintenance works (RF101BT0101000040967-01) |
23 November 2026 | 25 November 2026 | Planned | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Beechcroft Drive | Wootton |
Highway repair and maintenance works (RF101BT0103000040966-01) |
17 November 2026 | 19 November 2026 | Planned | Some carriageway incursion | Isle of Wight Council / Island Roads | View |
| Sherbourne Avenue | Ryde |
Highway repair and maintenance works (RF101BT0103000040965-01) |
16 November 2026 | 18 November 2026 | Planned | Some carriageway incursion | Isle of Wight Council / Island Roads | View |
| Ningwood Hill | Shalfleet |
Utility asset works (LP300S30000294-02) |
17 November 2026 | 17 November 2026 | Planned | Two-way signals | Scottish and Southern Power Distribution (SSE) | View |
| Newport Road | Ventnor |
Utility repair and maintenance works (LQ003SWAT14689404-02) |
22 February 2027 | 15 April 2027 | Planned | Road closure | Southern Water | View |
| Tennyson Road | Yarmouth |
Highway repair and maintenance works (RF101BT0103000040935-01) |
27 October 2026 | 29 October 2026 | In progress – Started: 27 October 2026 | Two-way signals | Isle of Wight Council / Island Roads | View |
| River Road | Yarmouth |
Highway repair and maintenance works (RF101BT0103000040934-01) |
27 October 2026 | 27 October 2026 | In progress – Started: 27 October 2026 | Two-way signals | Isle of Wight Council / Island Roads | View |
| Binstead Road | Ryde |
Utility repair and maintenance works (XW150W122532241-00189-02) |
25 January 2027 | 5 March 2027 | Planned | Multi-way signals | Southern Gas Network Plc | View |
| Victoria Avenue | Shanklin |
Highway repair and maintenance works (RF101BT0103000040959-01) |
16 November 2026 | 18 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Whippingham Road | East Cowes |
Highway repair and maintenance works (RF102BT0301000040956-01) |
3 November 2026 | 5 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Staplers Road | Newport |
Highway repair and maintenance works (RF101BT0103000040950-01) |
8 December 2026 | 10 December 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Victoria Street | Ventnor |
Highway improvement works (RF102BT0501000040954-02) |
30 November 2026 | 11 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Lynch Lane | Calbourne |
Utility repair and maintenance works (LQ006SWAT14716596-02) |
10 December 2026 | 10 December 2026 | Planned | Road closure | Southern Water | View |
| Springvale Road | Seaview |
Utility repair and maintenance works (LQ006SWAT14667051-04) |
15 December 2026 | 15 December 2026 | Planned | Road closure | Southern Water | View |
| Whitcombe Road | Newport |
Highway improvement works (RF102BT0501000040838-02) |
11 November 2026 | 20 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Springvale Road | Seaview |
Highway improvement works (RF102BT0501000039684-02) |
18 November 2026 | 4 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Hale Common | Arreton |
Highway repair and maintenance works (RF101BT0103000040953-01) |
1 December 2026 | 3 December 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Arreton Street | Arreton |
Highway repair and maintenance works (RF101BT0103000040952-01) |
15 December 2026 | 17 December 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Arreton Street | Arreton |
Highway repair and maintenance works (RF101BT0103000040951-01) |
15 December 2026 | 17 December 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Avenue Road | Sandown |
Highway repair and maintenance works (RF101BT0103000040949-01) |
24 November 2026 | 26 November 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Upper House Lane | Chale |
Remedial works (YP018CH240-CH-LANES-UHL1-06) |
5 January 2027 | 8 January 2027 | Planned | Road closure | Wightfibre | View |
| Wykeham Close | Binstead |
Utility repair and maintenance works (XW150W122518496-01959-01) |
18 October 2026 | 20 November 2026 | In progress – Started: 22 October 2026 | Give and take | Southern Gas Network Plc | View |
| Esplanade | Sandown |
Highway repair and maintenance works (RF101BT0101000040786-02) |
14 September 2026 | 30 November 2026 | In progress – Started: 18 September 2026 | Some carriageway incursion | Isle of Wight Council / Island Roads | View |
| Pitts Lane | Binstead |
Utility repair and maintenance works (XW150W122518271-01299-02) |
23 August 2026 | 18 December 2026 | In progress – Started: 26 August 2026 | Road closure | Southern Gas Network Plc | View |
| Culver Parade | Sandown |
Utility asset works (YP018WF-SS172-CP01-01) |
11 January 2027 | 13 January 2027 | Planned | Some carriageway incursion | Wightfibre | View |
| Newport Road | Apse Heath |
Utility asset works (BC312FB-CENE-23084-01) |
25 November 2026 | 27 November 2026 | Planned | Two-way signals | BT | View |
| Main Road | Shalfleet |
Highway repair and maintenance works (RF101BT0101000040944-02) |
17 November 2026 | 17 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| High Street | Ryde |
Utility asset works (BC412HABL2C7-WH3MK22D-05) |
25 January 2027 | 27 January 2027 | Planned | Road closure | BT | View |
| Longhalves Lane | Freshwater |
Highway repair and maintenance works (RF10126026186-01) |
22 July 2026 | 22 January 2027 | In progress – Started: 22 July 2026 | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Ashey Road | Ryde |
Highway repair and maintenance works (RF101BT0103000040330-02) |
26 October 2026 | 30 October 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Downsview Gardens | Wootton |
Utility asset works (BC512HABL2C-WH8MF76J-01) |
8 December 2026 | 10 December 2026 | Planned | Some carriageway incursion | BT | View |
| Woodvale Road | Gurnard |
Utility asset works (YP018WF-CW007-WR01-02) |
4 January 2027 | 6 January 2027 | Planned | Some carriageway incursion | Wightfibre | View |
| Westfield Park | Ryde |
Utility asset works (BC512HABL2C-WH8HJM9M-01) |
3 December 2026 | 7 December 2026 | Planned | Some carriageway incursion | BT | View |
| James Avenue | Lake |
Utility asset works (BC512HABL2C-WH8HW52D-01) |
4 December 2026 | 8 December 2026 | Planned | Give and take | BT | View |
| Lamorbey Road | Lake |
Utility asset works (BC512HABL2C-WH8CHC1P-1-01) |
19 November 2026 | 23 November 2026 | Planned | Some carriageway incursion | BT | View |
| Meadow Close | Lake |
Utility asset works (BC512HABL2C-WH8CHC1P-01) |
19 November 2026 | 23 November 2026 | Planned | Some carriageway incursion | BT | View |
| Greenways | Newport |
Utility asset works (BC512HABL2C-WH8FP15H-01) |
2 December 2026 | 4 December 2026 | Planned | Some carriageway incursion | BT | View |
| Macketts Lane | Arreton |
Highway repair and maintenance works (LQ002SWAT14646621-02) |
23 November 2026 | 24 November 2026 | Planned | Road closure | Southern Water | View |
| Swanmore Road | Ryde |
Utility asset works (BC412HABL2C-WH3MK22D-04) |
25 January 2027 | 27 January 2027 | Planned | Road closure | BT | View |
| Seaview Lane | Nettlestone |
Utility repair and maintenance works (XW150W122528915-001485-02) |
8 February 2027 | 1 April 2027 | Planned | Multi-way signals | Southern Gas Network Plc | View |
| Seagrove Manor Road | Seaview |
Utility repair and maintenance works (XW150W122483302-01484-02) |
4 January 2027 | 5 February 2027 | Planned | Give and take | Southern Gas Network Plc | View |
| Racecourse | Newport |
Highway improvement works (RF102BT0501000040863-02) |
4 January 2027 | 22 January 2027 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Racecourse | Newport |
Highway improvement works (RF102BT0501000040862-02) |
4 January 2027 | 22 January 2027 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Ninham Close | Shanklin |
Highway repair and maintenance works (RF101BT0103000040941-02) |
10 November 2026 | 12 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Sandrock Road | Niton |
Highway repair and maintenance works (RF101BT0103000040942-02) |
11 November 2026 | 13 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Grange Road | East Cowes |
Utility repair and maintenance works (XW150W123588395-00691-02) |
16 November 2026 | 4 December 2026 | Planned | Two-way signals | Southern Gas Network Plc | View |
| Esplanade | Ryde |
Highway repair and maintenance works (RF101BT0101000040870-02) |
19 October 2026 | 2 December 2026 | In progress – Started: 19 October 2026 | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Eddington Road | Seaview |
Permanent reinstatement (LQ002SWAT14656274-02) |
18 November 2026 | 20 November 2026 | Planned | Two-way signals | Southern Water | View |
| Station Road | Wootton |
Utility repair and maintenance works (LQ002SWAT14524431-03) |
18 October 2026 | 27 November 2026 | In progress – Started: 19 October 2026 | Road closure | Southern Water | View |
| Victoria Avenue | Shanklin |
Utility asset works (BC008OGEAA7103123L2CSB-02) |
23 March 2027 | 23 March 2027 | Planned | Road closure | BT | View |
| Racecourse | Newport |
Highway improvement works (RF10232624268-02) |
17 January 2029 | 4 February 2029 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Fairlee Road | Newport |
Highway improvement works (RF102BT0501000040600-02) |
6 March 2029 | 30 March 2029 | Planned | Lane closure | Isle of Wight Council / Island Roads | View |
| Fairlee Road | Newport |
Highway improvement works (RF102BT0501000039372-02) |
31 January 2029 | 3 March 2029 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Fairlee Road | Newport |
Highway improvement works (RF102BT0501000039373-02) |
17 January 2029 | 4 February 2029 | Planned | Lane closure | Isle of Wight Council / Island Roads | View |
| Medina Way | Newport |
Highway repair and maintenance works (RF10195319748-02) |
19 October 2027 | 26 November 2027 | Planned | Lane closure | Isle of Wight Council / Island Roads | View |
| Medina Way | Newport |
Highway repair and maintenance works (RF10170938807-02) |
11 January 2028 | 17 February 2028 | Planned | Lane closure | Isle of Wight Council / Island Roads | View |
| Blythe Shute | Chale |
Utility asset works (YP018WF-CH240-BS01-02) |
17 December 2026 | 21 December 2026 | Planned | No carriageway incursion | Wightfibre | View |
| Salem Road | Shanklin |
Utility asset works (BC008OGEAA710312301L2CSB-02) |
23 March 2027 | 23 March 2027 | Planned | Road closure | BT | View |
| Colwell Lane | Totland |
Remedial works (YP018FW264-LANES-CL01-04) |
15 March 2027 | 19 March 2027 | Planned | Road closure | Wightfibre | View |
| Sandcove Rise | Seaview |
Utility asset works (BC512HABL2C-WH8G5K9Z-01) |
20 November 2026 | 24 November 2026 | Planned | Some carriageway incursion | BT | View |
| South Street | Newport |
Utility asset works (BC312FB-CENE-V9038-17-01) |
26 November 2026 | 30 November 2026 | Planned | Some carriageway incursion | BT | View |
| Morton Common | Brading |
Highway improvement works (RF102BT0501000039321-02) |
18 January 2027 | 5 February 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Whitecross Avenue | Shanklin |
Highway improvement works (RF10284057656-02) |
4 January 2027 | 15 January 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| The Cut | St Helens |
Highway repair and maintenance works (RF10153786574-01) |
13 October 2026 | 2 November 2026 | In progress – Started: 13 October 2026 | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Elenors Grove | Binstead |
Utility asset works (YP018WF-WN043-EG01-01) |
26 November 2026 | 30 November 2026 | Planned | No carriageway incursion | Wightfibre | View |
| Sandown Road | Shanklin |
Utility asset works (BC312FB-CENE-V23079-1-01) |
24 November 2026 | 26 November 2026 | Planned | Some carriageway incursion | BT | View |
| Medina Way | Newport |
Highway repair and maintenance works (RF00115234860-02) |
23 February 2027 | 26 February 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Medina Way | Newport |
Highway repair and maintenance works (RF00172884313-02) |
23 February 2027 | 26 February 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Medina Way | Newport |
Highway repair and maintenance works (RF00101496267-02) |
15 February 2027 | 18 February 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Medina Way | Newport |
Highway repair and maintenance works (RF00107201965-02) |
12 January 2027 | 15 January 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Medina Way | Newport |
Highway repair and maintenance works (RF00169277606-02) |
15 December 2026 | 18 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Medina Way | Newport |
Highway repair and maintenance works (RF00117477249-02) |
10 November 2026 | 13 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Little London | Newport |
Highway repair and maintenance works (RF00116300418-02) |
27 September 2026 | 12 March 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| High Street | Godshill |
Highway improvement works (RF102BT0501000036316-02) |
2 November 2026 | 29 January 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Old Seaview Lane | Seaview |
Utility repair and maintenance works (XW150W122519401-01225-02) |
16 November 2026 | 11 December 2026 | Planned | Road closure | Southern Gas Network Plc | View |
| Old Seaview Lane | Seaview |
Utility asset works (YP018WF-SV164-OSL01-04) |
25 November 2026 | 27 November 2026 | Planned | Temp obstruction 15 minute delay | Wightfibre | View |
| Castle Road | Ventnor |
Utility asset works (BC412HABOSAWH6LDN0B-02) |
12 January 2027 | 15 January 2027 | Planned | Road closure | BT | View |
| Newport Road | Ventnor |
Highway repair and maintenance works (RF102BT0301000040919-01) |
21 October 2026 | 23 October 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Main Road | Thorley |
Highway repair and maintenance works (RF101BT0103000040322-02) |
19 October 2026 | 23 October 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Paddock Road | Shanklin |
Remedial works (YP018SS179-MMB-31-09) |
10 March 2027 | 12 March 2027 | Planned | Some carriageway incursion | Wightfibre | View |
| York Lane | Totland |
Remedial works (YP018FW260-LANES-YL02-03) |
8 March 2027 | 10 March 2027 | Planned | Road closure | Wightfibre | View |
| Quay Street | Yarmouth |
Utility repair and maintenance works (XW312W123617925-01362-01) |
30 November 2026 | 7 December 2026 | Planned | Some carriageway incursion | Southern Gas Network Plc | View |
| Bullen Road | Nettlestone |
Utility asset works (BC412HABOSAWH1HV77K-02) |
4 February 2027 | 5 February 2027 | Planned | Road closure | BT | View |
| College Way | East Cowes |
Highway improvement works (RF102BT0501000040901-02) |
14 December 2026 | 18 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Broadway | Sandown |
Highway repair and maintenance works (RF102BT0301000040908-02) |
1 December 2026 | 3 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Bellevue Road | Ventnor |
Utility asset works (BC412HABOSA-WGRV3D9M-POL-02) |
12 January 2027 | 13 January 2027 | Planned | Road closure | BT | View |
| Broadway | Sandown |
Utility asset works (BC412HABOSA-WGTRFV8Y-POL-01) |
3 February 2027 | 4 February 2027 | Planned | Two-way signals | BT | View |
| Church Place | Chale |
Utility repair and maintenance works (LQ006SWAT14695761-04) |
2 December 2026 | 3 December 2026 | Planned | Road closure | Southern Water | View |
| Albert Street | Ventnor |
Utility asset works (BC312FB-CENE-V9071-10-01) |
30 October 2026 | 3 November 2026 | Planned | Some carriageway incursion | BT | View |
| Main Road | Shalfleet |
Highway improvement works (RF102BT0501000036314-02) |
4 April 2027 | 15 April 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Church Road | Cowes |
Disconnection or alteration of supply (XW312W123581821-00364-01) |
23 November 2026 | 30 November 2026 | Planned | Road closure | Southern Gas Network Plc | View |
| Lane End Road | Bembridge |
Utility asset works (YP018WF-BE168-LER01-07) |
24 November 2026 | 26 November 2026 | Planned | Two-way signals | Wightfibre | View |
| Woods Drive | Newchurch |
Utility asset works (BC512HABL2C-WH7W403F-01) |
18 November 2026 | 20 November 2026 | Planned | Some carriageway incursion | BT | View |
| Victoria Grove | East Cowes |
Utility repair and maintenance works (XW150W123253884-01801-02) |
27 July 2026 | 18 December 2026 | In progress – Started: 28 July 2026 | Multi-way signals | Southern Gas Network Plc | View |
| High Street | Newchurch |
Highway repair and maintenance works (LQ002SWAT14602214-02) |
4 October 2026 | 30 March 2027 | In progress – Started: 5 October 2026 | Road closure | Southern Water | View |
| Winford Road | Newchurch |
Highway repair and maintenance works (LQ002SWAT14602228-02) |
4 October 2026 | 30 March 2027 | In progress – Started: 5 October 2026 | Road closure | Southern Water | View |
| Totland Footpath 1 | Totland |
Disconnection or alteration of supply (XW312W123750331-07337-01) |
30 October 2026 | 6 November 2026 | Planned | Some carriageway incursion | Southern Gas Network Plc | View |
| School Green Road | Freshwater |
Remedial works (YP018FW263-LANES-SGR01-09) |
4 January 2027 | 15 January 2027 | Planned | No carriageway incursion | Wightfibre | View |
| Albert Street | Newport |
Utility repair and maintenance works (XW150W123334360-00036-02) |
4 January 2027 | 29 January 2027 | Planned | Road closure | Southern Gas Network Plc | View |
| Drake Road | Newport |
Utility repair and maintenance works (XW150W123334305-00533-02) |
9 November 2026 | 4 December 2026 | Planned | Road closure | Southern Gas Network Plc | View |
| High Street | Sandown |
Utility repair and maintenance works (XW312W12362354-00815-01) |
16 November 2026 | 23 November 2026 | Planned | Some carriageway incursion | Southern Gas Network Plc | View |
| Sycamore Gardens | Newport |
Utility asset works (BC512HABL2C-WH7V780B-01) |
12 November 2026 | 16 November 2026 | Planned | Some carriageway incursion | BT | View |
| Rectory Road | Shanklin |
Utility asset works (BC512HABL2C-WH7WW01C-01) |
16 November 2026 | 18 November 2026 | Planned | Some carriageway incursion | BT | View |
| Hefford Road | East Cowes |
Utility asset works (BC512HABL2C-WH7V7L0N-01) |
17 November 2026 | 19 November 2026 | Planned | Some carriageway incursion | BT | View |
| High Street | Ventnor |
Utility asset works (BC412HABOSA-WH2N6C6J-FC-02) |
11 January 2027 | 13 January 2027 | Planned | Some carriageway incursion | BT | View |
| Terrace Road | Newport |
Utility repair and maintenance works (XW150W123334335-01691-02) |
30 November 2026 | 18 December 2026 | Planned | Road closure | Southern Gas Network Plc | View |
| New Street | Sandown |
Utility repair and maintenance works (XW150W123255499-01164-03) |
1 February 2027 | 19 February 2027 | Planned | Road closure | Southern Gas Network Plc | View |
| Coastguard Path | Totland |
Utility repair and maintenance works (XW312W123618080-05627-01) |
29 October 2026 | 5 November 2026 | Planned | No carriageway incursion | Southern Gas Network Plc | View |
| Newport Road | Apse Heath |
Highway improvement works (RF10221567110-02) |
9 May 2027 | 27 May 2027 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Canteen Road | Newchurch |
Highway repair and maintenance works (LQ002SWAT14680468-02) |
2 February 2027 | 4 February 2027 | Planned | Road closure | Southern Water | View |
| Milligan Road | Ryde |
Utility repair and maintenance works (LQ002SWAT14694828-02) |
16 November 2026 | 18 November 2026 | Planned | Road closure | Southern Water | View |
| Upton Road | Ryde |
Utility asset works (YP018WF-RY155-UR01-03) |
7 December 2026 | 11 December 2026 | Planned | Two-way signals | Wightfibre | View |
| Foreland Road | Bembridge |
Utility repair and maintenance works (LQ006SWAT14695073-02) |
15 December 2026 | 16 December 2026 | Planned | Road closure | Southern Water | View |
| Swanmore Road | Ryde |
Highway repair and maintenance works (RF101BT0103000040876-01) |
5 October 2026 | 6 October 2026 | Planned | Some carriageway incursion | Isle of Wight Council / Island Roads | View |
| School Green Road | Freshwater |
Remedial works (YP018FW263-LANES-SGRO2-04) |
4 January 2027 | 15 January 2027 | Planned | Two-way signals | Wightfibre | View |
| School Green Road | Freshwater |
Remedial works (YP018FW263-LANES-SGR04-03) |
4 January 2027 | 15 January 2027 | Planned | No carriageway incursion | Wightfibre | View |
| Upper Green Road | St Helens |
Remedial works (YP018SH166-32-14) |
22 February 2027 | 26 February 2027 | Planned | Two-way signals | Wightfibre | View |
| Duver Road | St Helens |
Remedial works (YP018SH166-23-04) |
1 March 2027 | 5 March 2027 | Planned | Multi-way signals | Wightfibre | View |
| Esplanade | Ryde |
Highway repair and maintenance works (RF101BT0103000040871-01) |
7 October 2026 | 9 October 2026 | Planned | Some carriageway incursion | Isle of Wight Council / Island Roads | View |
| Staplers Road | Newport |
Highway improvement works (RF102BT0501000040849-02) |
30 November 2026 | 2 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Marshcombe Shute | Brading |
Utility asset works (BC008WH2WPW3S06ETHSB-01) |
11 January 2027 | 15 January 2027 | Planned | Two-way signals | BT | View |
| Chale Street | Chale |
Utility asset works (YP018WF-CH240-CS01-02) |
18 November 2026 | 20 November 2026 | Planned | No carriageway incursion | Wightfibre | View |
| Racecourse | Newport |
Highway improvement works (RF102BT0501000040854-01) |
18 January 2027 | 5 February 2027 | Planned | Some carriageway incursion | Isle of Wight Council / Island Roads | View |
| Whitepit Lane | Newport |
Remedial works (LQ002SWAT14247952-03) |
11 January 2027 | 13 January 2027 | Planned | Road closure | Southern Water | View |
| Yaverland Road | Sandown |
Utility asset works (BC008WH2WPW3S07ETHSB-01) |
11 January 2027 | 15 January 2027 | Planned | Two-way signals | BT | View |
| Bembridge Road | Sandown |
Utility asset works (BC008WH2WPW3S05ETHSB-01) |
11 January 2027 | 15 January 2027 | Planned | Road closure | BT | View |
| High Street | Niton |
Permanent reinstatement (YP018WF-NI235-HS01-02) |
27 January 2027 | 29 January 2027 | Planned | No carriageway incursion | Wightfibre | View |
| High Street | Niton |
Remedial works (YP018NI235-LANES-HS02-10) |
27 January 2027 | 29 January 2027 | Planned | Some carriageway incursion | Wightfibre | View |
| Blackgang Road | Niton |
Utility asset works (BC512HABOSAWGQGKD9M-01) |
4 January 2027 | 6 January 2027 | Planned | Road closure | BT | View |
| High Salterns | Seaview |
Utility asset works (BC512HABOSAWH7DGK0B-01) |
4 January 2027 | 8 January 2027 | Planned | Some carriageway incursion | BT | View |
| Main Road | Shalfleet |
Remedial works (YP018CA250-SH-LANES-MR01-08) |
15 February 2027 | 19 February 2027 | Planned | Road closure | Wightfibre | View |
| Binstead Road | Ryde |
Highway improvement works (RF102BT0501000040270-01) |
30 November 2026 | 2 December 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| St Johns Hill | Ryde |
Highway improvement works (RF102BT0501000040160-02) |
30 November 2026 | 2 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Green Street | Ryde |
Highway improvement works (RF102BT0501000040158-02) |
30 November 2026 | 2 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Arreton Street | Arreton |
New service connection (LP333S30000762-01) |
17 May 2027 | 28 May 2027 | Planned | Two-way signals | Scottish and Southern Power Distribution (SSE) | View |
| Alverstone Road | Newchurch |
Remedial works (YP018WF-AP225-AR03-08) |
25 January 2027 | 27 January 2027 | Planned | Two-way signals | Wightfibre | View |
| Sandown Road | Arreton |
Highway repair and maintenance works (RF101BT0103000040831-01) |
30 September 2026 | 2 October 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Castle Street | Carisbrooke |
Highway improvement works (RF102BT0501000039316-02) |
14 December 2026 | 18 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Sandown Road | Shanklin |
Highway repair and maintenance works (RF101BT0103000040830-01) |
29 September 2026 | 1 October 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| St Boniface Road | Ventnor |
Remedial works (YP018WF-VR186-SBR03-03) |
20 January 2027 | 22 January 2027 | Planned | Two-way signals | Wightfibre | View |
| Rectory Road | Niton |
Remedial works (YP018NI235-LANES-RR02-10) |
18 January 2027 | 20 January 2027 | Planned | Multi-way signals | Wightfibre | View |
| Steephill Court Road | Ventnor |
Utility asset works (YP018VR182-LANES-SCR5-04) |
21 December 2026 | 23 December 2026 | Planned | Some carriageway incursion | Wightfibre | View |
| Denness Road | Lake |
Highway repair and maintenance works (RF101BT0103000040823-02) |
14 October 2026 | 16 October 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Sandown And Shanklin Footpath 59 | Lake |
Highway repair and maintenance works (RF10182484187-01) |
15 September 2026 | 4 December 2026 | In progress – Started: 15 September 2026 | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Gatcombe Village Road | Gatcombe |
Highway repair and maintenance works (RF10138477390-01) |
28 August 2026 | 4 December 2026 | In progress – Started: 28 August 2026 | Road closure | Isle of Wight Council / Island Roads | View |
| Pier Street | Ventnor |
Highway repair and maintenance works (RF10128177950-01) |
3 August 2026 | 4 December 2026 | In progress – Started: 3 August 2026 | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Mersley Downs Road | Arreton |
Highway repair and maintenance works (RF101BT0103000040817-02) |
5 April 2027 | 7 April 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Brading Down Road | Brading |
Highway repair and maintenance works (RF101BT0103000040818-02) |
5 April 2027 | 7 April 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| St Marys Road | Cowes |
Highway repair and maintenance works (RF10191482920-01) |
15 July 2026 | 4 December 2026 | In progress – Started: 15 July 2026 | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Church Street | Ventnor |
Highway repair and maintenance works (RF10119340314-01) |
18 June 2026 | 4 December 2026 | In progress – Started: 18 June 2026 | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| York Avenue | East Cowes |
Utility repair and maintenance works (XW150W123604720-01968-03) |
7 December 2026 | 19 March 2027 | Planned | Multi-way signals | Southern Gas Network Plc | View |
| Beatrice Avenue | East Cowes |
Utility repair and maintenance works (XW150W123768214-00155-02) |
13 September 2026 | 4 December 2026 | In progress – Started: 14 September 2026 | Give and take | Southern Gas Network Plc | View |
| Havenstreet Main Road | Havenstreet |
Utility asset works (BC412HABL2CWH5NV32R-03) |
1 December 2026 | 3 December 2026 | Planned | Road closure | BT | View |
| Main Road | Chillerton |
Utility asset works (YP018WF-GD187-MR02-01) |
30 November 2026 | 4 December 2026 | Planned | Two-way signals | Wightfibre | View |
| Kite Hill | Wootton |
Highway improvement works (RF102BT0501000040793-02) |
3 October 2027 | 14 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| High Street | Wootton |
Highway improvement works (RF102BT0501000040794-02) |
3 October 2027 | 14 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Firestone Copse Road | Wootton |
Highway improvement works (RF10246593191-02) |
3 October 2027 | 14 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| New Road | Wootton |
Highway improvement works (RF10257407005-02) |
3 October 2027 | 14 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| High Street | Ventnor |
Utility asset works (BC412HABOSAWH2N6C6J-01) |
23 November 2026 | 25 November 2026 | Planned | Road closure | BT | View |
| Godshill Park Road | Godshill |
Highway repair and maintenance works (RF101BT0103000040789-02) |
30 September 2026 | 2 October 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Whippingham Road | East Cowes |
Highway improvement works (RF102BT0501000039371-02) |
3 January 2028 | 21 January 2028 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Ventnor Road | Newchurch |
Highway repair and maintenance works (RF102BT0301000040782-02) |
7 October 2026 | 9 October 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Town Lane | Chale |
Highway improvement works (RF102BT0501000039364-02) |
7 December 2026 | 18 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Merstone Lane | Godshill |
Remedial works (YP018AP225ARVP-LANES-ML1-09) |
1 February 2027 | 12 February 2027 | Planned | Road closure | Wightfibre | View |
| Bouldnor Road | Shalfleet |
Highway repair and maintenance works (RF10170986285-01) |
16 July 2026 | 4 December 2026 | In progress – Started: 16 July 2026 | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| St James Street | Yarmouth |
Utility asset works (BC412-HABL2CWH6MTF1P-02) |
7 December 2026 | 9 December 2026 | Planned | Road closure | BT | View |
| Church Hill | Godshill |
Utility asset works (BC412-HABOSA-WGSWL87X-1-02) |
23 November 2026 | 25 November 2026 | Planned | Road closure | BT | View |
| Upper Road | Brading |
Utility asset works (BC412-HABOSAWH5LN76W-POL-02) |
2 December 2026 | 4 December 2026 | Planned | Road closure | BT | View |
| Eastcliff Promenade | Shanklin |
Highway repair and maintenance works (RF10154787855-01) |
22 November 2022 | 10 January 2027 | In progress – Started: 22 November 2022 | Road closure | Isle of Wight Council / Island Roads | View |
| Forest Road | Newport |
Highway repair and maintenance works (RF102BT0301000040739-01) |
2 November 2026 | 4 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Blythe Way | Shanklin |
Utility asset works (BC412HABL2C-WH6KFK6W-01) |
21 September 2026 | 23 September 2026 | Planned | Give and take | BT | View |
| Upper Road | Brading |
Highway repair and maintenance works (RF102BT0301000040710-02) |
15 September 2026 | 17 September 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Arctic Road | Cowes |
Highway repair and maintenance works (RF101BT0103000040712-02) |
14 December 2026 | 18 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Castle Road | Ventnor |
Utility repair and maintenance works (XW150W123486804-00303-02) |
6 June 2027 | 29 July 2027 | Planned | Road closure | Southern Gas Network Plc | View |
| Bellevue Road | Ventnor |
Utility repair and maintenance works (XW150W123486784-00169-02) |
9 May 2027 | 3 June 2027 | Planned | Road closure | Southern Gas Network Plc | View |
| Chapel Lane | Arreton |
Remedial works (YP018AP225ARVP-LANES-CL1-06) |
8 December 2026 | 11 December 2026 | Planned | Road closure | Wightfibre | View |
| Station Road | Shalfleet |
Remedial works (YP018CA250-SH-VP-LANES-S-05) |
8 December 2026 | 10 December 2026 | Planned | Two-way signals | Wightfibre | View |
| Orchard Road | Nettlestone |
Remedial works (YP018SV164-MMB-13-10) |
7 December 2026 | 9 December 2026 | Planned | Some carriageway incursion | Wightfibre | View |
| East View | Newport |
Utility asset works (LP44443758302-02) |
18 December 2026 | 23 December 2026 | Planned | Road closure | Scottish and Southern Power Distribution (SSE) | View |
| St Johns Road | Newport |
Utility asset works (LP44435667461-02) |
4 December 2026 | 8 December 2026 | Planned | Road closure | Scottish and Southern Power Distribution (SSE) | View |
| Hale Common | Arreton |
Highway repair and maintenance works (RF102BT0301000040684-01) |
12 October 2026 | 14 October 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Sandown Road | Arreton |
Highway repair and maintenance works (RF102BT0301000040683-01) |
12 October 2026 | 14 October 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Godshill Road | Shanklin |
Highway repair and maintenance works (RF102BT0301000040687-01) |
18 November 2026 | 20 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Newport Road | Apse Heath |
Highway repair and maintenance works (RF102BT0301000040681-01) |
2 September 2026 | 4 September 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Church Road | Shanklin |
Utility repair and maintenance works (LQ003SWAT14637151-04) |
23 November 2026 | 4 December 2026 | Planned | Road closure | Southern Water | View |
| Elenors Grove | Binstead |
Highway repair and maintenance works (RF102BT0301000040686-01) |
6 January 2027 | 8 January 2027 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Havenstreet Main Road | Havenstreet |
Highway repair and maintenance works (RF102BT0301000040685-01) |
19 October 2026 | 21 October 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Church Road | Havenstreet |
Remedial works (YP018WN041-HA-LANES-CR1-09) |
16 November 2026 | 27 November 2026 | Planned | Road closure | Wightfibre | View |
| Carisbrooke Road | Newport |
Highway repair and maintenance works (RF101BT0103000040670-02) |
4 January 2027 | 8 January 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Godshill Byway 48 | Wroxall |
Highway repair and maintenance works (RF101BT0103000040665-02) |
8 September 2026 | 10 September 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Car Park Coppins Bridge | Newport |
Highway repair and maintenance works (RF10189409226-01) |
19 August 2026 | 21 August 2026 | Planned | Some carriageway incursion | Isle of Wight Council / Island Roads | View |
| Limerstone Road | Shorwell |
Highway repair and maintenance works (RF102BT0301000040657-01) |
26 August 2026 | 28 August 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Sheepwash Lane | Godshill |
Highway repair and maintenance works (RF101BT0103000040643-02) |
2 September 2026 | 4 September 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Zig Zag Road | Ventnor |
Highway improvement works (RF102BT0501000040608-02) |
9 May 2027 | 27 May 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Little Whitehouse Road | Calbourne |
Highway repair and maintenance works (RF101BT0101000040645-02) |
2 September 2026 | 4 September 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Barton Road | Newport |
Highway repair and maintenance works (RF101BT0103000040650-02) |
30 November 2026 | 4 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Staplers Road | Newport |
Highway repair and maintenance works (RF101BT0103000040649-02) |
30 November 2026 | 4 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| New Barn Road | East Cowes |
Utility repair and maintenance works (XW150W123605370-01156-01) |
2 May 2027 | 27 May 2027 | Planned | Two-way signals | Southern Gas Network Plc | View |
| Trafalgar Road | Newport |
Highway repair and maintenance works (RF101BT0103000040634-01) |
4 January 2027 | 6 January 2027 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Leeson Road | Ventnor |
Highway improvement works (RF102BT0501000040606-02) |
11 April 2027 | 29 April 2027 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Pier Street | Sandown |
Highway improvement works (RF102BT0501000040625-02) |
15 November 2027 | 26 November 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Wellington Road | Ryde |
Highway improvement works (RF102BT0501000040627-02) |
29 November 2027 | 17 December 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Brading Road | Ryde |
Highway improvement works (RF102BT0501000040628-02) |
3 January 2028 | 14 January 2028 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Main Road | Rookley |
Highway improvement works (RF102BT0501000040629-02) |
31 January 2028 | 11 February 2028 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Royal Street | Sandown |
Highway improvement works (RF102BT0501000040630-02) |
14 February 2028 | 25 February 2028 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Landguard Road | Shanklin |
Highway improvement works (RF102BT0501000040631-02) |
28 February 2028 | 17 March 2028 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Seldon Avenue | Ryde |
Highway improvement works (RF102BT0501000040604-02) |
11 April 2027 | 22 April 2027 | Planned | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Nelson Lane | Ryde |
Highway improvement works (RF102BT0501000040605-02) |
11 April 2027 | 22 April 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Hambrough Road | Ventnor |
Highway improvement works (RF102BT0501000040609-02) |
16 May 2027 | 27 May 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Wilkes Road | Sandown |
Highway improvement works (RF102BT0501000040611-02) |
30 May 2027 | 10 June 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Lower Furlongs | Brading |
Highway improvement works (RF102BT0501000040612-02) |
6 June 2027 | 1 July 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Adelaide Court Road | Ryde |
Highway improvement works (RF102BT0501000040613-02) |
27 June 2027 | 8 July 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Tennyson Close | Ryde |
Highway improvement works (RF102BT0501000040615-02) |
4 July 2027 | 15 July 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Union Road | Ryde |
Highway improvement works (RF102BT0501000040616-02) |
4 July 2027 | 15 July 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| North Street | Ventnor |
Highway improvement works (RF102BT0501000040617-02) |
18 July 2027 | 29 July 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Parsonage Road | Sandown |
Highway improvement works (RF102BT0501000040618-02) |
25 July 2027 | 5 August 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Bettesworth Road | Ryde |
Highway improvement works (RF102BT0501000040619-02) |
1 August 2027 | 19 August 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Carter Street | Sandown |
Highway improvement works (RF102BT0501000040620-02) |
15 August 2027 | 9 September 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Buona Vista Path | Ventnor |
Highway improvement works (RF102BT0501000040621-02) |
12 September 2027 | 30 September 2027 | Planned | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Blackgang Road | Niton |
Highway improvement works (RF102BT0501000040623-02) |
26 September 2027 | 14 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Cliff Road | Lake |
Highway improvement works (RF102BT0501000040624-02) |
10 October 2027 | 21 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| New Street | Sandown |
Highway improvement works (RF102BT0501000040632-02) |
20 March 2028 | 30 March 2028 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Kent Street | Ryde |
Highway improvement works (RF102BT0501000040603-02) |
4 April 2027 | 15 April 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Carisbrooke Road | Newport |
Highway repair and maintenance works (RF101BT0103000040601-01) |
21 October 2026 | 23 October 2026 | Planned | Stop/go boards | Isle of Wight Council / Island Roads | View |
| Zig Zag Road | Ventnor |
Utility repair and maintenance works (XW150W123486708-01978-03) |
1 March 2027 | 6 May 2027 | Planned | Road closure | Southern Gas Network Plc | View |
| Main Road | Shalfleet |
Highway repair and maintenance works (RF101BT0103000040599-01) |
16 November 2026 | 18 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Station Road | Wootton |
Highway repair and maintenance works (RF101BT0103000040597-01) |
22 September 2026 | 24 September 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Trinity Road | Ventnor |
Highway repair and maintenance works (RF102BT0301000040592-01) |
19 October 2026 | 21 October 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Holyrood Street | Newport |
Highway repair and maintenance works (RF102BT0301000040584-02) |
11 November 2026 | 13 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Newnham Road | Binstead |
Highway repair and maintenance works (RF101BT0103000040587-02) |
11 November 2026 | 13 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Park Road | Wootton |
Highway repair and maintenance works (RF101BT0103000040590-02) |
7 December 2026 | 9 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Park Road | Wootton |
Highway repair and maintenance works (RF102BT0301000040591-02) |
7 December 2026 | 9 December 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Pier Street | Sandown |
Highway improvement works (RF102BT0501000040543-02) |
18 April 2027 | 9 May 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| James Avenue | Lake |
Highway improvement works (RF102BT0501000040555-02) |
19 September 2027 | 7 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Calbourne Road | Newport |
Highway improvement works (RF102BT0501000040540-02) |
18 April 2027 | 9 May 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Esplanade | Sandown |
Highway improvement works (RF102BT0501000040544-02) |
18 April 2027 | 9 May 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| High Street | Carisbrooke |
Highway improvement works (RF102BT0501000040539-02) |
18 April 2027 | 9 May 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Carter Street | Sandown |
Highway improvement works (RF102BT0501000040545-02) |
18 April 2027 | 9 May 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| James Avenue | Lake |
Highway improvement works (RF102BT0501000040554-02) |
19 September 2027 | 7 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Westhill Road | Shanklin |
Highway improvement works (RF102BT0501000040563-02) |
3 October 2027 | 7 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Lake Green Road | Lake |
Highway improvement works (RF102BT0501000040561-02) |
27 September 2027 | 7 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Westhill Road | Shanklin |
Highway improvement works (RF102BT0501000040565-02) |
4 October 2027 | 7 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| St Johns Crescent | Sandown |
Highway improvement works (RF102BT0501000040546-02) |
18 April 2027 | 9 May 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Melville Street | Sandown |
Highway improvement works (RF102BT0501000040557-02) |
21 September 2027 | 7 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Nunwell Street | Sandown |
Highway improvement works (RF102BT0501000040559-02) |
22 September 2027 | 7 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Fairlee Road | Newport |
Highway improvement works (RF102BT0501000040547-02) |
18 April 2027 | 9 May 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| West Street | Ryde |
Highway improvement works (RF102BT0501000040548-02) |
18 April 2027 | 9 May 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Station Lane | Sandown |
Highway improvement works (RF102BT0501000040550-02) |
18 April 2027 | 9 May 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Lovett Way | Shanklin |
Highway improvement works (RF102BT0501000040551-02) |
18 April 2027 | 9 May 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| North Street | Brighstone |
Highway improvement works (RF102BT0501000040552-02) |
18 April 2027 | 9 May 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Fairview Crescent | Lake |
Highway improvement works (RF102BT0501000040562-02) |
29 September 2027 | 7 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Hatherton Road | Shanklin |
Highway improvement works (RF102BT0501000040556-02) |
20 September 2027 | 7 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| New Street | Sandown |
Highway improvement works (RF102BT0501000040560-02) |
26 September 2027 | 7 October 2027 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Freshwater Road | Shalfleet |
Highway repair and maintenance works (RF102BT0301000040567-01) |
1 September 2026 | 3 September 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Victoria Road | Cowes |
Highway repair and maintenance works (RF101BT0103000040528-01) |
4 November 2026 | 6 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Halletts Shute | Yarmouth |
Highway repair and maintenance works (RF102BT0301000040526-01) |
7 October 2026 | 9 October 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Yarmouth Road | Cranmore |
Highway repair and maintenance works (RF102BT0301000040527-01) |
28 October 2026 | 30 October 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Broadway | Sandown |
Highway repair and maintenance works (RF101BT0103000040524-01) |
1 September 2026 | 3 September 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Whitehouse Road | Newport |
Highway repair and maintenance works (RF102BT0301000040536-02) |
26 August 2026 | 28 August 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Godshill Road | Shanklin |
Utility asset works (BC412-HABOSA-WGTT5W4G-1-01) |
12 October 2026 | 14 October 2026 | Planned | Road closure | BT | View |
| Gunville Road | Carisbrooke |
Highway repair and maintenance works (RF102BT0301000040518-01) |
18 August 2026 | 20 August 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Firestone Copse Road | Wootton |
Highway repair and maintenance works (RF102BT0301000040493-02) |
18 August 2026 | 20 August 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Chestnut Close | Newport |
Utility repair and maintenance works (XW150W122483887-00340-02) |
8 March 2027 | 1 April 2027 | Planned | Give and take | Southern Gas Network Plc | View |
| Shide Road | Newport |
Utility repair and maintenance works (XW150W122541691-01501-02) |
8 February 2027 | 26 March 2027 | Planned | Road closure | Southern Gas Network Plc | View |
| Esplanade | Seaview |
Utility repair and maintenance works (XW150W123498064-00589-02) |
16 November 2026 | 11 December 2026 | Planned | Road closure | Southern Gas Network Plc | View |
| Queens Road | Newport |
Utility repair and maintenance works (XW150W122483856-01369-02) |
4 January 2027 | 12 February 2027 | Planned | Multi-way signals | Southern Gas Network Plc | View |
| College Road | Newport |
Utility repair and maintenance works (XW150W122483391-00415-02) |
4 April 2027 | 20 May 2027 | Planned | Give and take | Southern Gas Network Plc | View |
| West Street | Wroxall |
Remedial works (YP018WR230-LANES-WES01-04) |
23 November 2026 | 4 December 2026 | Planned | Road closure | Wightfibre | View |
| South View | Newport |
Utility asset works (LP44438197055-01) |
18 December 2026 | 23 December 2026 | Planned | Some carriageway incursion | Scottish and Southern Power Distribution (SSE) | View |
| Delphi Road | Shanklin |
Highway improvement works (RF102BT0501000040450-01) |
13 March 2028 | 24 March 2028 | Planned | Some carriageway incursion | Isle of Wight Council / Island Roads | View |
| Newport Road | Lake |
Highway repair and maintenance works (RF101BT0103000040443-01) |
8 December 2026 | 10 December 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Newport Road | Lake |
Highway repair and maintenance works (RF101BT0103000040442-01) |
8 December 2026 | 10 December 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Station Road | Wootton |
Highway repair and maintenance works (RF101BT0103000040441-01) |
7 December 2026 | 11 December 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| York Avenue | East Cowes |
Highway repair and maintenance works (RF101BT0103000040440-01) |
24 November 2026 | 26 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Cowes Road | Newport |
Highway repair and maintenance works (RF101BT0103000040439-01) |
24 November 2026 | 26 November 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Newnham Road | Binstead |
Highway repair and maintenance works (RF101BT0103000040438-01) |
23 November 2026 | 27 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Broadway | Sandown |
Highway repair and maintenance works (RF101BT0103000040435-01) |
3 November 2026 | 5 November 2026 | Planned | Stop/go boards | Isle of Wight Council / Island Roads | View |
| Main Road | Shalfleet |
Highway repair and maintenance works (RF102BT0301000040433-01) |
28 October 2026 | 30 October 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Brighstone Road | Brook |
Highway repair and maintenance works (RF102BT0301000040432-01) |
20 October 2026 | 22 October 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Whippingham Road | East Cowes |
Highway repair and maintenance works (RF102BT0301000040428-01) |
29 September 2026 | 1 October 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Hollow Lane | Godshill |
Highway repair and maintenance works (RF101BT0103000040413-02) |
4 August 2026 | 6 August 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Alverstone Road | Newchurch |
Highway repair and maintenance works (RF102BT0301000040417-02) |
5 August 2026 | 7 August 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Gloucester Road | Ventnor |
Highway repair and maintenance works (RF101BT0103000040420-02) |
12 August 2026 | 14 August 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Old Seaview Lane | Seaview |
Highway repair and maintenance works (RF101BT0103000040400-01) |
14 December 2026 | 16 December 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| St James Street | Newport |
Highway repair and maintenance works (RF101BT0103000040399-01) |
17 November 2026 | 19 November 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| High Street | Ventnor |
Highway repair and maintenance works (RF101BT0103000040397-01) |
11 November 2026 | 13 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| East Hill Road | Ryde |
Highway repair and maintenance works (RF101BT0103000040394-01) |
9 November 2026 | 13 November 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Forest Road | Newport |
Highway repair and maintenance works (RF102BT0301000040393-01) |
3 November 2026 | 5 November 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Appley Road | Ryde |
Highway repair and maintenance works (RF101BT0103000040392-01) |
2 November 2026 | 4 November 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Military Road | Shorwell |
Highway repair and maintenance works (RF102BT0301000040380-01) |
13 October 2026 | 15 October 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Yarmouth Road | Calbourne |
Highway repair and maintenance works (RF102BT0301000040382-01) |
20 October 2026 | 22 October 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Medina Avenue | Newport |
Highway repair and maintenance works (RF101BT0103000040377-01) |
6 October 2026 | 8 October 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Staplers Road | Newport |
Highway repair and maintenance works (RF101BT0103000040371-01) |
15 September 2026 | 17 September 2026 | Planned | Two-way signals | Isle of Wight Council / Island Roads | View |
| Leeson Road | Ventnor |
Highway repair and maintenance works (RF101BT0103000040341-02) |
10 November 2026 | 12 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Leeson Road | Ventnor |
Highway repair and maintenance works (RF101BT0103000040339-02) |
10 November 2026 | 12 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Albert Street | Ventnor |
Highway repair and maintenance works (RF101BT0103000040314-02) |
6 October 2026 | 8 October 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Leeson Road | Ventnor |
Highway repair and maintenance works (RF101BT0103000040340-02) |
10 November 2026 | 12 November 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Main Road | Wellow |
Highway repair and maintenance works (RF101BT0103000040332-02) |
19 October 2026 | 23 October 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Ferry Road | East Cowes |
Highway repair and maintenance works (RF101BT0103000040317-02) |
13 October 2026 | 15 October 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Ventnor Road | Whitwell |
Highway repair and maintenance works (RF102BT0301000040294-02) |
1 October 2026 | 2 October 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| Hillis Gate Road | Northwood |
Highway repair and maintenance works (RF101BT0103000040283-01) |
14 September 2026 | 18 September 2026 | Planned | Road closure | Isle of Wight Council / Island Roads | View |
| James Avenue | Lake |
Utility asset works (BC412HABL2C-WH3R2T1P-01) |
15 July 2026 | 19 July 2026 | Planned | Some carriageway incursion | BT | View |
| Esplanade | Sandown |
Highway improvement works (RF00152259684-01) |
1 July 2026 | 15 July 2026 | Planned | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Esplanade | Shanklin |
Highway improvement works (RF00146189022-01) |
1 July 2026 | 15 July 2026 | Planned | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Esplanade | Sandown |
Highway improvement works (RF00161355803-01) |
1 July 2026 | 15 July 2026 | Planned | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Esplanade | Sandown |
Highway improvement works (RF00127957872-01) |
1 July 2026 | 15 July 2026 | Planned | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Esplanade | Sandown |
Highway improvement works (RF00132672939-01) |
1 July 2026 | 15 July 2026 | Planned | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| North Walk | Ryde |
Highway improvement works (RF00103676918-01) |
1 July 2026 | 15 July 2026 | Planned | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| North Walk | Ryde |
Highway improvement works (RF00100927512-01) |
1 July 2026 | 15 July 2026 | Planned | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| North Walk | Ryde |
Highway improvement works (RF00126915872-01) |
1 July 2026 | 15 July 2026 | Planned | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Esplanade | Ventnor |
Highway improvement works (RF00114909199-01) |
1 July 2026 | 15 July 2026 | Planned | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| Car Park Eastern Esplanade | Ventnor |
Highway improvement works (RF00124598708-01) |
1 July 2026 | 15 July 2026 | Planned | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| St James Street | Newport |
Highway repair and maintenance works (RF102BT0301000040200-01) |
12 October 2026 | 16 October 2026 | Planned | Multi-way signals | Isle of Wight Council / Island Roads | View |
| Cycle Track From Shanklin To Wroxall | Shanklin |
Highway repair and maintenance works (RF00120765253-01) |
15 June 2026 | 19 June 2026 | Planned | No carriageway incursion | Isle of Wight Council / Island Roads | View |
| No roadworks match the selected filters. | ||||||||